My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution Certifying EIR For San Lorenzo Sewer <br />Lift Station And Approval Of Sewer Lift Station Project <br />February 7, 2011 <br />Page 2 <br />As originally proposed, the project would have required condemnation of approximately 292 square <br />feet of private property owned by the Santa Ana California Lodge, LLC. However, the City has <br />identified minor modifications to the proposed Project's design that will avoid the need for <br />condemnation of private property. <br />As described in the Final EIR, the reconfigured facility will maintain an approximate five-foot <br />separation from the parcel owned by the Lodge and would thereby avoid the need for the <br />condemnation. The proposed changes are minor in nature and do not warrant recirculation of the <br />Draft EIR pursuant to CEQA. Therefore staff recommends that the City Council adopt the resolution <br />certifying the Final Environmental Impact Report for the San Lorenzo Sewer Lift Station and <br />approve the project as described in the Final EIR. <br />Attached as Exhibit 3 is the Final EIR Summary Section and the responses to the comments <br />received. Copies of the Final EIR are available for public review at the City Clerk's Office and at the <br />Public Works counter on the first floor of the Ross Annex. <br />ENVIRONMENTAL IMPACT <br />The Final Environmental Impact Report (FEIR) has been prepared in accordance with CEQA. <br />Virtually all of the significant environmental impacts associated with this project are temporary <br />impacts that occur due to construction activities and can be mitigated to below the level of <br />significance. The one significant long-term impact identified was the possibility of odors emanating <br />from the lift station and impacting sensitive receptors. However, this potential impact is reduced to <br />"less than significant" by incorporating an odor control system into the lift station design. The EIR <br />only identified one significant impact that could not be mitigated below the level of significance: <br />Traffic disruption due to lane closures on Segerstrom Avenue and Bristol Street. This impact is a <br />near-term impact and would only occur during five weeks of the construction schedule. <br />As required by CEQA, the City has prepared specific findings on each significant impact of the <br />proposed project, the mitigation measures for those impacts, and a Statement of Overriding <br />Considerations explaining the specific reasons that the Project's economic, legal, social, <br />technological, or other benefits outweigh its adverse environmental impact. <br />55B-2
The URL can be used to link to this page
Your browser does not support the video tag.