My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />1.1 Introduction <br />This document reflects the Mitigation Monitoring and Reporting Program (MMRP) requirements of <br />Public Resources Cod (PRC) Section 21081.6. The California Environmental Quality Act (CEQA) <br />Guidelines Section 15097 states: <br />...In order to ensure that the mitigation measures and project revisions identified in the EIR <br />or negative declaration are implemented, the public agency shall adopt a program for <br />monitoring or reporting on the revisions which it has required in the project and the measures <br />it has imposed to mitigate or avoid significant environmental effects. A public agency may <br />delegate reporting or monitoring responsibilities to another public agency or to a private <br />entity which accepts the delegation; however, until mitigation measures have been completed <br />the lead agency remains responsible for ensuring that implementation of the mitigation <br />measures occurs in accordance with the program. <br />1.2 Enforcement <br />In accordance with CEQA, the primary responsibility for making determinations with respect to <br />potential environmental effects rests with the lead agency rather than the monitor or preparer. As <br />such, the City of Santa Ana is identified as the enforcement agency for this MMRP. <br />1.3 Program Modification <br />After review and approval by the lead agency, minor changes to the MMRP are permitted but can <br />only be made by the City of Santa Ana. No deviations from this MMRP shall be permitted unless it <br />continues to satisfy the requirements of PRC Section 21081.6, as determined by the lead agency. <br />1.4 Mitigation Monitoring and Reporting Program <br />The organization of this MMRP follows the subsection formatting style as presented within the San <br />Lorenzo Sewer Lift Station Environmental Impact Report (EIR). Only those subsections of the <br />environmental issues presented in the EIR that have mitigation measures are provided below in Table <br />1, Mitigation Monitoring and Reporting Program Matrix. All other subsections in the EIR do not <br />contain mitigation measures. <br />San Lorenzo Lift Station EIR (Project No. 06-3510) MMRP-1 <br />Mitigation Monitoring and Reporting Program <br />55B-38
The URL can be used to link to this page
Your browser does not support the video tag.