My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - EIR SAN LORENZO SEWER LIFT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/07/2011
>
55B - RESO - EIR SAN LORENZO SEWER LIFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:53:43 PM
Creation date
2/1/2011 4:12:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
55B
Date
2/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. The City has prepared Findings of Fact in compliance with Public Resources <br />Code Sections 21081 and 21081.5 and CEQA Guidelines Section 15091 for every <br />significant impact of the San Lorenzo Sewer Lift Station Project, including an <br />explanation of the rationale for each finding. <br />H. The San Lorenzo Sewer Lift Station Project will have one significant <br />transportation/traffic impact that cannot be mitigated to below the level of <br />significance. <br />1. The City has prepared a Statement of Overriding Considerations in compliance <br />with Public Resources Code Sections 21081 and CEQA Guidelines Section 15093, <br />which finds that specific economic, legal, social, technological or other benefits of <br />the San Lorenzo Sewer Lift Station Project outweigh the significant and <br />unavoidable impact identified in the EIR. <br />J. The City has prepared a Mitigation, Monitoring and Reporting Program (MMRP) <br />in compliance with Public Resources Code Sections 21081.6 and CEQA <br />Guidelines Section 15087 to ensure compliance with the mitigation measures <br />identified in the EIR during project construction, implementation and operation. <br />K. All attached documents, including the Final EIR, the MMRP, the findings and <br />statement of overriding considerations, the Request for Council Action dated <br />February 7, 2011, and the record of proceedings are incorporated herein by this <br />reference as though fully set forth. <br />Section 2. The City Council of the City of Santa Ana further finds, determines, and <br />declares as follows: <br />A. The City Council certifies that: <br />1) The Final EIR has been completed in compliance with CEQA. <br />2) The Final EIR was presented to the City Council of the City of Santa Ana, <br />which reviewed and considered the information contained in the Final EIR <br />prior to approving the project. <br />3) The Final EIR reflects the City of Santa Ana's independent judgment and <br />analysis. <br />B. The City Council adopts the Findings of Fact and Statement of Overriding <br />Considerations, attached to this Resolution as "Exhibit A." <br />C. The City Council adopts the Mitigation Monitoring and Reporting Program, <br />attached to this Resolution as "Exhibit B." <br />D. All attached documents, including the Mitigation Monitoring and Reporting <br />Program, the CEQA Findings of Fact and the Statement of Overriding <br />Considerations, are hereby incorporated by reference as though set forth in full. <br />55B-6
The URL can be used to link to this page
Your browser does not support the video tag.