My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN & ASSOCIATES 4 -2009
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN & ASSOCIATES 4 -2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:18:42 PM
Creation date
2/2/2011 12:30:12 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN & ASSOCIATES
Contract #
A-2009-212
Agency
PUBLIC WORKS
Council Approval Date
12/21/2009
Insurance Exp Date
4/1/2020
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA TRANSPORTATION SYSTEM IMPROVEMENT AREA (TSIA) STUDY <br />SCOPE OF SERVICES <br />Task A: Forecast Traffic <br />The purpose of this task is to quantify future development, and develop the traffic forecasts that will be used <br />for the nexus analysis, and document information about future roadway improvements (committed <br />improvements as well as other potential improvements in the study area). <br />The City of Santa Ana will provide a list of proposed future development within the study area and available <br />traffic studies. If these developments represent less than full build -out of the City's General Plan, it is <br />assumed that the City will also provide information about other potential future development (land use types, <br />quantities, and locations) for the 2035 scenario. Estimates of development timing will be obtained from the <br />reports or from City staff. <br />To be able to use the land use information as the basis for OCTAM trip forecasting (rather than relying on <br />OCTAM's socioeconomic forecasts), we will apply OCTA's Subarea Modeling Guidelines to convert the land <br />use data to socioeconomic data and then generate trips (productions and attractions) by purpose. <br />Analysis of existing traffic conditions will be needed as a base for developing the future traffic forecasts, and <br />to demonstrate that the improvements in the fee program are not addressing existing congestion problems. <br />Since traffic volumes are somewhat lower than normal during the current recessionary period, any new traffic <br />counts will be reviewed and adjusted if necessary to be consistent with pre -recession counts. <br />We are proposing several adaptations of OCTAM so the modeling will address the particular needs of this <br />study: <br />• We will incorporate the land use -based trip generation into OCTAM, while maintaining OCTAM trip levels <br />outside the local area to provide reasonable growth in background (through) traffic for Build -out year <br />analysis. <br />• We will adjust trip generation to account for reduced trip -making associated with mixed use and transit - <br />oriented developments. <br />• We will post -process (adjust) the raw model outputs so the future forecasts will be based on, and <br />consistent with, the existing traffic counts. <br />As part of the modeling in this task, we will produce future traffic forecasts and Level of Service results for the <br />study area roads and intersections, to lay the groundwork for identification of needed improvements in Task <br />B. <br />The updated list of committed improvements will be used in Task B to help identify potential improvements <br />to alleviate existing congestion. The updated cost allocation table will provide information on sources and <br />amounts of committed funding, so that those amounts will be excluded from the fee calculations in Task C. <br />To maximize efficiency of the study process (so we won't need to go back later and redo work elements in <br />response to feedback from the City), and avoid the need for more meetings than have been outlined in the <br />RFP, we are proposing an interim data review process to obtain City feedback when each step is complete, <br />rather than waiting until the end of the entire task. We will submit completed data elements (land use tables, <br />committed improvements lists, existing traffic counts and LOS, future volumes and LOS, and cost allocation <br />table) to the City when each is completed, and request review and comment before we apply those data in <br />subsequent steps. Not only will this make the process more smooth and efficient, but it also will contribute <br />to our step-by-step consensus -building process. <br />The following section lists the activities that we have identified as part of each task component <br />
The URL can be used to link to this page
Your browser does not support the video tag.