My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 - HsgDivProjAct
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2006
>
04-03-2006
>
04 - HsgDivProjAct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 5:19:00 PM
Creation date
2/9/2011 9:18:25 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
04
Date
4/3/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monthly Report for Housing <br />Division Projects and Activities <br />April 3, 2006 <br />Page 3 <br />have been paid off during the fiscal year. The loan portfolio has <br />generated $816,566 in program income from loan repayments since the <br />beginning of the fiscal year. <br />Compliance Monitoring <br />Over the years, the City and Agency have received funds from various <br />State and Federal programs. These funds each have specific restrictions <br />and requirements. The Division is responsible for ensuring that the <br />projects are in compliance with these requirements, and that the units <br />meet the City's municipal code as it relates to public health and safety <br />requirements. Monitoring includes case file review, unit inspections, <br />non-profit certifications and onsite auditing. As of the end of January, <br />the Division was responsible for monitoring 1,197 units. Staff is <br />focusing on auditing loan files from the City's Rehabilitation Program. <br />Development Projects/Multi-Family Rehabilitation <br />Birch Street <br />On January 3, 2006, the Redevelopment Agency awarded a contract for the <br />construction of four California Bungalow style single-family homes in the <br />Historic Heninger Park Neighborhood. After working diligently with the <br />selected contractor, he was unable to obtain the necessary performance <br />bond. Staff is now reviewing options available. <br />McFadden Infill Site (between Maple and Oran <br />Currently staff is working with an architect <br />which will be taken to the neighborhood <br />distributing a Request for Qualifications <br />August. <br />Raitt Street Infill Site <br />Streets <br />to develop conceptual plans, <br />by May. Staff anticipates <br />to select a developer by <br />Staff is negotiating with Civic Center Barrio Housing Corporation to <br />develop attached homes on the site. It is anticipated that these homes <br />will be sold to low-income families. The number of units that will be <br />developed on the site has yet to be determined. Staff anticipates <br />bringing a Disposition and Development Agreement (DDA) to the City <br />Council and Redevelopment Agency by December. <br />in <br />
The URL can be used to link to this page
Your browser does not support the video tag.