My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN & ASSOCIATES 6 - 2010
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
KIMLEY-HORN & ASSOCIATES 6 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 1:36:45 PM
Creation date
2/14/2011 11:25:23 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN & ASSOCIATES
Contract #
A-2010-215
Agency
PLANNING & BUILDING
Council Approval Date
11/15/2010
Insurance Exp Date
7/2/2011
Destruction Year
2017
Notes
Amended by A-2010-215-01
Document Relationships
KIMLEY-HORN & ASSOCIATES ,INC. 6A - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2 -- PHASE I ENVIRONMENTAL SITE ASSESSMENT <br />Kimley-Horn will prepare a Phase I Environmental Site Assessment (ESA) in accordance with the <br />due diligence procedures and methodology presented in the American Society for Testing 8, <br />Materials (ASTM) E 1527-05. The propose of the Phase I ESA is to provide the following: <br />• An identification of Recognized Environmental Conditions (RECs) as defined in ASTM E <br />1527-05,1.1.1 <br />• An opinion of the impacts on the property resulting from conditions identified during the <br />investigation, by a qualified Environmental Professional (EP) (ASTM E 1527-05,12.6) <br />• An opinion, by a qualified EP, on the need for additional investigations (ASTM E 1527-05, <br />12.6.1) <br />• A statement consistent with ASTM E 1527-05, 12.13, on the qualifications of the EP and <br />the suitability of the Phase I ESA to meet the requirements of The All Appropriate Inquiry <br />Rule, CFR 40 312. <br />This Phase I ESA will also provide comments on non -scope considerations defined under ASTM -E <br />1527-45,13. <br />The assessment will reflect the general national standard of practice and the local customary <br />practice as understood by Kimley-Horn. The EP will use ASTM 1527-05 along with our judgment <br />and experience when reviewing results of the assessment and in identifying findings and RECs <br />(ASTM E 1527-05, 1.6). Kimley-Horn's scope of services for conducting the Phase I ESA consists <br />of the sub -tasks set forth below. The following tasks refer to only that information that is defined <br />as reasonably ascertainable (ASTM E 1527-05, 6.2.1). <br />TASK 2.1 RECORDS REVIEW <br />This task consists of the following; <br />An environmental database search will be prepared encompassing the minimum search <br />distances listed in ASTM E1527-05, 8.2.1. This report will be reviewed for known and <br />suspected contaminated sites. Where available, local environmental agency files and <br />other local governmental authority files, as defined in ASTM E 1527-05, 8.2.2 may be <br />reviewed, if the EP determines the files to be reasonably ascertainable and relevant to the <br />successful completion of the Phase I ESA. <br />• Kimley-Horn will review readily available databases on institutional and engineering <br />controls (IC/EC) and Activity Use Limitations (AULs). <br />• Kimley-Horn will retrieve and examine readily available historical aerial photographs of <br />the site and the surrounding vicinity. Aerial photographs will be researched to the <br />earliest date that is reasonably obtainable. <br />Kimley-Horn will obtain and review readily available historical city directories, fire <br />insurance maps, and historical topographic maps. <br />City of Santa Ana - 2 - Kimley-Horn and Associates, Inc. <br />MND for McDonald's Restaurant Apr!! 30, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.