My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - RIGHT-OF-WAY PROJECT MNGT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
25B - AGMT - RIGHT-OF-WAY PROJECT MNGT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:33 PM
Creation date
2/17/2011 11:39:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25B
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2 Coordinate - meeting with the selected appraiser and review appraiser to review <br />and discuss USPAP, Uniform Act, and California Code of Regulations, and Title 25 require- <br />ments. Coordinate with City staff and City Attorney's office the type of reports required <br />and the required written notice of inspection 'to the owner. In all cases a complete ap- <br />praisal Is required. The format and level of documentation for an appraisal report depend <br />on the complexity of the appraisal problem. Complex property assignments are to be <br />reported in a self-contained, narrative format. A summary report in conformance with <br />USPAP Standards Rule 2-2(b) is permitted in cases, which, by virtue of their low value <br />or simplicity, do not require the In-depth analysis and presentation necessary in a self- <br />contained appraisal report. A summary report may be acceptable on complex property <br />assignments on a case-by-case basis as determined by the City. <br />r-+ <br />6.3 Complete Appraisal Summary Statements - Obtain appraisals for each ac- <br />quisition prepared in accordance with the State of California Laws and USPAP, date <br />stamp, record information and properly disperse reports. Review appraisal report and <br />prepare an Appraisal Summary Statement, in accordance with the applicable regulations, <br />including Assembly Bill 237, These Appraisal Summary Statements will be utilized as part <br />a.. <br />of the "Offer Letter." <br />6.4 Tenant-Owned Improvements - Coordinate and review completeness and <br />accuracy of fixtures and equipment appraisals. During the initial appraisal process, coor- <br />dinate with fee appraiser, FF&E appraiser, fee owner and tenant identification and owner- <br />ship of tenant-owed improvements, if necessary Specialty Appraisals shall be ordered, <br />?a <br />and a copy submitted to the appraiser & review appraiser for inclusion In the appraisal <br />and appraisal review analysis. <br />zi <br />em <br />7.0 APPRAISAL REVIEW- ESTABLISHMENT OF JUST COMPENSATION <br />4" <br />m TASK NO. <br />7.1 Appraisal Review - If federal funding Is involved with a specific project assign- <br />t" ment, coordinate and obtain reviews of the appraisals referenced above in accordance <br />°- with the Uniform Appraisal Standards for Federal Land Acquisitions, other applicable <br />Federal Laws, State of California Laws, Public Law 91-646, Title III, and USPAP. <br />t1_4 25B-18 24
The URL can be used to link to this page
Your browser does not support the video tag.