My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Madison Park: 5 Days per wk , Feb 1St to July 15th <br />3 Day per wk, July 16th to Jan 31St <br />Memorial Park: 5 Days per wk, Feb 1St to July 15th <br />1 Day per wk July 16th to Jan 31 st <br />Morrison Park: 3 Days per wk, Feb 1St to July 15th <br />1 Day per wk July 16th to Jan 31 St <br />Portola Park: 3 Days per wk, Feb 1St to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />Riverview Park: 5 Days per wk, Feb 1St to July 15th <br />3 Day per wk, July 16th to Jan 31st <br />Rosita Park: 5 Days per wk, March 1St to July 30th <br />1 Day per wk, July 30th to Feb 28th <br />Santiago Park: 5 Days per wk Year round <br />Thornton Park: 5 Days per wk Year round <br />Windsor Park: 3 Days per wk Feb 1St to July 15th <br />1 Day per wk July 16th to January 31st <br />4.0 <br />Field Composition Mix (Brickdust) To Be Used When Maintaining In-fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana <br />ball field, the specific type of material to be used is: Pro Gold Infield <br />Mix with stabilizer from Gail Materials (951) 279-1095. <br />4.2 Pitchers Mound/Home Plate/Basepath Areas <br />When adding a mix with a higher clay composition material to any pitcher's <br />mound/home plate/base-path area, the specific type of material to be used is: Hill <br />Topper Home Plate and Mound Mix. <br />5.0 <br />Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance <br />operation the following equipment. <br />5.1 Utility Vehicle <br />Small tight turn radios (13') vehicle designed especially for this type of work. This <br />vehicle shall have the capability to make circle and figure eight patterns completely <br />36 <br />19C-38
The URL can be used to link to this page
Your browser does not support the video tag.