My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4 Wet Conditions Equipment" (Add to equipment above) <br />During periods of inclement weather or when the areas are wet the contractor shall have <br />"on-hand" during all brickdust maintenance operations the following items: <br />5.4.1 Squeegee: Used to push/squeeze water off wet areas or into dry areas or <br />drains. Shall be 24" to 36" wide with neoprene blade and <br />magnesium/aluminum head. <br />5.4.2 "Super Sopper": Used to collect standing water in brickdust areas. Shall <br />be drum type with exterior sponge and arm holding drum. <br />5.4.3 Diamond or Beckson Pump: Used to remove standing water in brickdust <br />areas. Shall be plastic with flexible piston and value. <br />5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water <br />in brickdust areas. Sopper shall be geotextile-covered sponge typical for <br />absorbing chemical spills. <br />6.0 Meetings <br />6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone <br />number to reach the contact person from the hours of 6:30am - 5:00pm, Monday - <br />Saturday. <br />6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor". This <br />site supervisor shall meet with staff one (1) time per week at a time and place agreed <br />upon by both parties for as long as the contract is in effect to discuss any <br />problems/concerns that may arise and any goals for the day/week. <br />6.3 In November of each year for as long as the contract is in effect, Contractor shall <br />personally meet with staff, along with the designated site supervisor, to discuss and <br />outline schedules for "Annual Renovations" (listed in Section 10.0). <br />7.0 Daily Infield Maintenance <br />7.1 General <br />7.1.1 Contractor shall remove all litter, broken glass and hazardous debris <br />from infield and dugout areas. <br />7.1.2 Contractor shall keep brickdust and dugout areas in a weed free <br />condition. <br />7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are <br />100% free of brickdust or any other debris. <br />38 <br />19C-40
The URL can be used to link to this page
Your browser does not support the video tag.