My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.14 TIME FOR COMPLETION <br />If awarded this project, the Contractor agrees to complete the work within the time parameters <br />jointly agreed upon by the City, SAPRF, and the Contractor prior to work commencement, <br />unless specific time deadlines are specified elsewhere in these specifications. Once the work <br />has commenced, the Contractor shall diligently prosecute the same to completion. <br />1.15 SUBCONTRACTORS <br />Subcontractors used in the performance of this project shall be listed in the Contractors Bid <br />Proposal. Subcontractors shall be properly licensed by the State of California as a contractor to <br />perform work of this specialty and hold a valid business permit and certificate of insurance <br />with the City of Santa Ana. Should any subcontractor fail to perform the work undertaken by <br />him to the satisfaction of the SAPRF, said subcontractor shall be removed immediately from <br />the project upon the request of the SAPRF and shall not again be employed on the project. The <br />Contractor shall be held liable for the correction of any deficient work. <br />1.16 ADDITIONS AND/OR DELETIONS OF WORK <br />The SAPRF representative reserves the right to add and/or delete tree work on this project as <br />deemed necessary and in the best interest of the SAPRF. Additions and/or deletions shall be <br />made at the unit price accepted by SAPRF upon award of contract. <br />1.17 INSPECTIONS <br />An authorized SAPRF representative will inspect the work performed by the contractor to <br />insure completion of the pruning in accordance with SAPRF Pruning specifications. Should <br />more than two (2) inspections be required on trees needing additional work, the contractor will <br />be billed for SAPRF staff time. <br />1. 18 BILLING <br />Contractor shall submit a fully itemized bill listing each tree noting: <br />a. Address (each tree). <br />b. Type of tree. <br />c. Date completed. <br />d. Person completing the job. <br />e. Location of tree (front, side right, side left, rear) <br />2.00 CONTRACTOR QUALIFICATIONS <br />All contractors are required to have a valid appropriate state contractor's license, current City of <br />Santa Ana business license, City Attorney approved certificate of insurance and be <br />knowledgeable in tree pruning and tree care prior to the commencement of any and all work. <br />2.01 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION <br />The current edition of the "Green Book", Standard Specifications for Public Works <br />Construction and it's updates, supplements and local addendums, shall be included as part of <br />these specifications, unless otherwise directed in these specifications. <br />2.02 PROTECTION OF EXISTING FACILITIES AND STRUCTURES <br />The Contractor shall exercise due care in protecting from damage all existing facilities, <br />structures, and utilities, both above surface and underground on the City's property. Any <br />53 <br />19C-56
The URL can be used to link to this page
Your browser does not support the video tag.