My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
19C - RFP - PARK LANDSCAPE MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:52:23 PM
Creation date
2/17/2011 11:55:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
2/22/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., Monday <br />through Friday. No work shall be performed on weekends or on City recognized holidays <br />without written SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for Public <br />Works Construction, latest edition, hereinafter referred to as Standard Specifications. In case <br />of conflict between the Standard Specifications and this Specification, this Specification shall <br />take precedence over and be used in lieu of such conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not complete <br />detail, it is understood that workmanship of the finest quality is to be used. Unless otherwise <br />specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and <br />do all the work involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment and the <br />protection of the public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal <br />combustion engine used for any purpose on the job or related to the job shall be equipped with <br />a muffler of a type recommended by the manufacturer of such equipment. No internal <br />combustion engine shall be operated on the project without said muffler. Full compensation for <br />conforming to the requirements of this section shall be considered as included in the prices paid <br />for the various contract items of work involved and no additional compensation will be allowed <br />therefore. Sounds, such as loud music, that are not related to the project, shall be kept at levels <br />so as to not disturb the general public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work at <br />least five (5) days before work is begun. The Contractor shall cooperate with local authorities <br />relative to handling traffic through the areas and shall make arrangements relative to keeping <br />the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether <br />empty or loaded, shall in all cases yield to public traffic. All traffic delineation and work area <br />protection shall conform to the Work Area Traffic Control Handbook (W.A.T.C.H.) 2000 <br />Edition. <br />The Contractor shall make every effort to keep commercial driveways open during working <br />hours. Should this not be possible, Contractor shall coordinate with the property owners <br />affected to insure that designated times of ingress and egress is available. After working hours, <br />all driveways shall be accessible with smooth and safe crossings through any construction area <br />(State of California Traffic Manual). <br />55 <br />19C-58
The URL can be used to link to this page
Your browser does not support the video tag.