My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br />WATER SUPPLY, WASTE & VENT PIPING <br />effective repairs are acceptable as long as compliance with <br />• Safe, sound and leak -free. <br />the minimum standard will be achieved. <br />• Piping (supply, waste and vent) that does not meet the <br />• <br />Toilets that require more than 1.6 GPF shall be replaced <br />regardless <br />of their condition. <br />Replacement Sinks <br />• <br />Reputable manufacturer. <br />Water Supply Piping <br />• <br />Cast iron, white enamel finish. <br />Replacement Faucets <br />• <br />EPA Water -Sense qualified. <br />• <br />Reputable manufacturer. <br />• <br />Brass construction, metal housing. <br />Replacement Toilets <br />• <br />Reputable manufacturer. <br />• <br />EPA Water -Sense qualified (1.28 GPF) <br />Replacement Tubs <br />• <br />Reputable manufacturer. <br />• <br />Cast iron body, white enamel finish, slip resistant bottom. <br />• <br />EPA Water -Sense qualified plumbing fixtures. <br />Replacement <br />• <br />Reputable manufacturer. <br />Combination <br />• <br />Cast iron body, white enamel finish, slip resistant bottom. <br />Tub - Showers <br />• <br />4" ceramic tile surround. <br />• <br />Anodized aluminum doors with tempered glass. <br />• <br />EPA Water -Sense qualified plumbing fixtures. <br />Replacement Showers <br />• <br />Reputable manufacturer. <br />• <br />4" ceramic tile. <br />0 <br />Anodized aluminum door with tempered glass. <br />a <br />EPA Water -Sense qualified plumbing fixtures. <br />Replacement <br />• <br />Reputable manufacturer. <br />Medicine Cabinets <br />• <br />Steel body, beveled mirror door. <br />Towel Bars & Toilet <br />• <br />Reputable manufacturer. <br />Paper Holders <br />• <br />Metal construction, polished chrome finish. <br />WATER SUPPLY, WASTE & VENT PIPING <br />Minimum Standard <br />• Safe, sound and leak -free. <br />Rehabilitation <br />• Piping (supply, waste and vent) that does not meet the <br />minimum standard shall be replaced. Practical, cost <br />effective repairs are acceptable as long as compliance with <br />the minimum standard will be achieved. <br />Replacement <br />• Copper, type "L ". <br />Water Supply Piping <br />Replacement <br />• Schedule 40 ABS. <br />Waste & Vent Piping <br />NSP3 Substantial Amendment <br />City of Santa Ana <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.