My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total Cost (This Item): <br />ITEM # 3 <br />SOD AND SPRINKLER IRRIGATION SYSTEM <br />Priority Code <br />B <br />Permits, fees, material, labor and supervision. <br />Rear Yard — 900 S.F. <br />Condition <br />$ <br />Overhead and profit <br />Total <br />ITEM # 3 <br />SOD AND SPRINKLER IRRIGATION SYSTEM <br />Priority Code <br />B <br />Location <br />Rear Yard — 900 S.F. <br />Condition <br />Existing Lawn is dead. Bare earth. Nosprinkler system exists. <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing dead lawn and weeds. <br />• Till and prepare the soil in accordance with the recommendation of the nursery providing <br />the sod. <br />• Install a new automatic sprinkler irrigation system with a weather based controller (Rain <br />Bird). <br />• Install a new sod lawn (Marathon II). <br />• Item includes maintenance of the sod for a period of two weeks. <br />Total Cost (This Item) <br />ITEM # 4 <br />FORCED -AIR GAS -FIRED FURNACE <br />Priority Code A <br />Location Garage <br />Condition Inoperable Forced -Air Gas -Fired Furnace <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing furnace. <br />• Install a new forced air furnace. Material allowance is $1,900. Energy Star qualified <br />model, reputable manufacturer, 80,000 BTU) <br />• Install a new programmable thermostat. Material allowance is $95.00. Energy Star <br />qualified model, reputable manufacturer. <br />H: \NSP \NSP - 3 \RFP for Intermediaries \Sample Development Budget (R).docx <br />41 ' IAC <br />Permits, fees, material, labor and supervision <br />Overhead and profit <br />Total <br />ITEM # 4 <br />FORCED -AIR GAS -FIRED FURNACE <br />Priority Code A <br />Location Garage <br />Condition Inoperable Forced -Air Gas -Fired Furnace <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing furnace. <br />• Install a new forced air furnace. Material allowance is $1,900. Energy Star qualified <br />model, reputable manufacturer, 80,000 BTU) <br />• Install a new programmable thermostat. Material allowance is $95.00. Energy Star <br />qualified model, reputable manufacturer. <br />H: \NSP \NSP - 3 \RFP for Intermediaries \Sample Development Budget (R).docx <br />41 ' IAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.