Laserfiche WebLink
Total Cost (This Item): <br />ITEM # 3 <br />SOD AND SPRINKLER IRRIGATION SYSTEM <br />Priority Code <br />B <br />Permits, fees, material, labor and supervision. <br />Rear Yard — 900 S.F. <br />Condition <br />$ <br />Overhead and profit <br />Total <br />ITEM # 3 <br />SOD AND SPRINKLER IRRIGATION SYSTEM <br />Priority Code <br />B <br />Location <br />Rear Yard — 900 S.F. <br />Condition <br />Existing Lawn is dead. Bare earth. Nosprinkler system exists. <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing dead lawn and weeds. <br />• Till and prepare the soil in accordance with the recommendation of the nursery providing <br />the sod. <br />• Install a new automatic sprinkler irrigation system with a weather based controller (Rain <br />Bird). <br />• Install a new sod lawn (Marathon II). <br />• Item includes maintenance of the sod for a period of two weeks. <br />Total Cost (This Item) <br />ITEM # 4 <br />FORCED -AIR GAS -FIRED FURNACE <br />Priority Code A <br />Location Garage <br />Condition Inoperable Forced -Air Gas -Fired Furnace <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing furnace. <br />• Install a new forced air furnace. Material allowance is $1,900. Energy Star qualified <br />model, reputable manufacturer, 80,000 BTU) <br />• Install a new programmable thermostat. Material allowance is $95.00. Energy Star <br />qualified model, reputable manufacturer. <br />H: \NSP \NSP - 3 \RFP for Intermediaries \Sample Development Budget (R).docx <br />41 ' IAC <br />Permits, fees, material, labor and supervision <br />Overhead and profit <br />Total <br />ITEM # 4 <br />FORCED -AIR GAS -FIRED FURNACE <br />Priority Code A <br />Location Garage <br />Condition Inoperable Forced -Air Gas -Fired Furnace <br />CONTRACTOR will provide all labor and material to: <br />• Remove and dispose of the existing furnace. <br />• Install a new forced air furnace. Material allowance is $1,900. Energy Star qualified <br />model, reputable manufacturer, 80,000 BTU) <br />• Install a new programmable thermostat. Material allowance is $95.00. Energy Star <br />qualified model, reputable manufacturer. <br />H: \NSP \NSP - 3 \RFP for Intermediaries \Sample Development Budget (R).docx <br />41 ' IAC <br />