My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. rate specification bid packages that abatement and demolition contractors can use to provide a <br />detailed cost estimate. This work will include site meetings with the contractors fro the bid pro- <br />I- cess, job walk, and the preparation of an addendum for clarification of any question in regards to <br />!fN <br />specification changes if required, <br />4" <br />-6u <br />10.3 Asbestos Abatement Monitoring & Visual Clearances - Monitoring of the project <br />,- during the abatement process. Provide all documentation collected during the process and provide <br />.W visual inspections of all regulated areas prior to the demolition process. Air Quality Clearances will <br />not be recommended as long as all units are sealed following abatement and signage remains in <br />place during the demolition process. If materials are allowed to be salvaged, full air.quality clear - <br />ances will be required for each regulated area after abatement. <br />an 10.4 Demolition Supervision & Coordination -Provide adequate field supervision of demoli- <br />Sao tion activities to ensure compliance with all City policies and procedures as well as all terms of the <br />® demolition contract. Perimeter air monitoring will be required during the demolition process the <br />first day, if the removal of ACM's is necessary and final air quality clearances are not conducted. <br />t 11.0 ESCROW COORDINATION <br />L", Task No. <br /><� 11.1 Monitor Escrows -- Coordinate with title companies and open escrows on all purchases. <br />Monitor escrows, review all escrow documents, request funds from City and ensure that the City <br />receives title insurance policies in the amount of the purchase cost of the land and improvements <br />«� and clear title to all properties acquired. <br />11.2 Partial Acquisition -- Special attention will be given on partial acquisitions, due to the <br />U' difficulty in obtaining partial release documents on a timely basis. At the City's option, the Project <br />28 <br />25B -22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.