My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
information contained in the above referenced documents shall be updated with <br />any new information as changes occur. The Director shall be immediately <br />notified of any changes to the above information. <br />c) Uniforms and Vehicle Identification <br />The Contractor shall provide to all field personnel a standard uniform including <br />but not limited to uniform company hats, collared work shirts, pants, jackets, <br />vests and ANSI approved safety shoes. All uniforms will be marked with some <br />form of company logo or other form of identification. <br />All vehicles and equipment on the project site shall be in operable and working <br />condition, clean appearance without visible damage, dirt graffiti etc. In <br />addition, all vehicles shall have the company's name clearly identified on the <br />right and left side doors. <br />B. SAFETY REQUIREMENTS <br />All work performed under this contract shall be completed with maximum safety as the <br />priority above all other requirements. In the event unsafe work is observed by City staff or <br />otherwise reported, the Director may at his discretion order Contractor to stop performing <br />and pay all costs and or damages resulting from the delay. <br />C. SAFETY NOTIFICATION <br />If Contractor identifies a potential safety issue, Contractor shall: <br />1. Notify the public that potentially unsafe conditions exist by installing yellow "Caution <br />Tape" and "A" frame barricades or equal substitute around the condition. <br />2. Notify the Director of the condition first by phone and then in writing (e -mail is <br />acceptable) including digital photographs of the potential safety concern. Once the <br />Contractor has notified the City and the public of the condition, as specified above, <br />Contractor shall have no further responsibility regarding the condition. <br />D. UNDERGROUND ALERT SYSTEMS <br />Underground Alert Systems (telephone number 1- 800 - 422 -4133) must be notified 48 -hours <br />in advance prior to any excavation work. . <br />E. PROPERTY DAMAGE <br />Any damage to private property caused by Contractor shall be immediately reported to the <br />property owner. Contractors shall pay for any damage caused to private property in <br />performing this agreement. <br />10 <br />19C -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.