My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
02/22/2011
>
FULL PACKET_2011-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:01:55 PM
Creation date
2/17/2011 1:18:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/22/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.l <br />5.0 <br />Madison Park: 5 Days per wk , Feb 1St to July 15th <br />3 Day per wk, July 16th to Jan 31St <br />Memorial Park: 5 Days per wk, Feb 1St to July 15th <br />1 Day per wk July 16th to Jan 31 st <br />Morrison Park: 3 Days per wk, Feb 1St to July 15th <br />1 Day per wk July 16th to Jan 31 St <br />Portola Park: 3 Days per wk, Feb 1St to July 15th <br />1 Day per wk, July 16" to Jan 31 st <br />Riverview Park: 5 Days per wk, Feb 1St to July 15th <br />3 Day per wk, July 16th to Jan 31st <br />Rosita Park: 5 Days per wk, March 1St to July 30th <br />1 Day per wk, July 30th to Feb 28" <br />Santiago Park: 5 Days per wk Year round <br />Thornton Park: 5 Days per wk Year round <br />Windsor Park: 3 Days per wk Feb 1St to July 15th <br />1 Day per wk July 16th to January 31st <br />Field Composition Mix ( Brickdust) To Be Used When Maintaining In- fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana <br />ball field, the specific type of material to be used is: Pro Gold Infield <br />Mix with stabilizer from Gail Materials (951) 279 -1095. <br />4.2 Pitchers Mound/Home Plate /Basepath Areas <br />When adding a mix with a higher clay composition material to any pitcher's <br />mound/home plate/base -path area, the specific type of material to be used is: Hill <br />Topper Home Plate and Mound Mix. <br />Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance <br />operation the following equipment. <br />5.1 Utility Vehicle <br />Small tight turn radios (13') vehicle designed especially for this type of work. This <br />vehicle shall have the capability to make circle and figure eight patterns completely <br />36 <br />19C -38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.