My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - 605-611 EAST WASHINGTON ST LOAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
25F - AGMT - 605-611 EAST WASHINGTON ST LOAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:30 PM
Creation date
3/3/2011 11:03:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25F
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
correct copy thereof, and Executive Director shall have reasonably approved such General <br />Contractor) as having the experience and financial resources (based on audited or unaudited financial <br />statements submitted to Executive Director) necessary to construct and complete the Project. <br />Developer shall submit to Agency and City evidence regarding each entity serving as a subcontractor <br />for the construction of each portion of the Improvements, along with satisfactory evidence of <br />necessary license(s), certification(s), bonding (with respect to the General Contractor's license bond <br />required by the State of California) and insurance, all as required by this Agreement and as <br />reasonably requested by Executive Director. Each Construction Contract (and all subcontracts) shall <br />include the Section 3 Clause set forth in Section 309.2 hereof. The Construction Contract with the <br />General Contractor shall be for a fixed, all-inclusive fee to complete all work to be performed by the <br />General Contractor to construct the Improvements, subject to approved change orders. <br />601.5 Construction Security. Developer shall have obtained and shall have <br />delivered to Agency and City an unconditional and irrevocable standby letter of credit in an amount <br />equal to fifteen percent (15%) of the total the construction costs for the Project, as set forth in the <br />Project Budget which is approved by Agency and City for the Project (collectively, "Performance <br />Letter of Credit"), along with reasonably satisfactory evidence demonstrating the General <br />Contractor's financial strength (such as the two most recent audited or unaudited financial statements <br />of General Contractor) and reputation for quality and timely work and performance necessary to <br />complete the Project in accordance with this Agreement. The Performance Letter of Credit shall be <br />deposited with the Executive Director and shall be in full force and effect with Agency and City's <br />unconditional and irrevocable right to draw on such instrument until thirty-five (35) days after the <br />date of recordation of the notice of completion in the event Developer (or its General Contractor) <br />ceases construction in violation of this Agreement or fails to complete construction of the Project in <br />violation of this Agreement. In such event, Agency and City shall have the right to draw on the <br />Performance Letter of Credit in its sole discretion, and have the sole and absolute right to determine <br />whether the proceeds of the Performance Letter of Credit shall be used to pay for the completion of <br />the Project. Agency and City will provide Developer with a copy of Agency's and City's (as <br />Beneficiaries) signed and dated statement provided to the Lender pursuant to the Performance Letter <br />of Credit effecting Agency's and City's draw on the Performance Letter of Credit, which copy will <br />be transmitted to Developer on the same date that the statement is transmitted to the Lender. In lieu <br />of the Performance Letter of Credit, Developer may propose providing Agency and City other forms <br />of other and/or additional security addressing the completion of construction (such as payment and <br />performance bonds covering one hundred percent (100%) of the Project), other bonds and sureties, <br />guarantees and/or combinations of any of those, collectively referred to herein as "Alternate <br />Security"), which Agency and City will approve and accept if the Executive Director determines in <br />her sole, reasonable discretion that such Alternate Security will provide Agency and City a level of <br />security that is substantially similar and equivalent to the Performance Letter of Credit. <br />601.6 Financing. The Agency shall have approved Developer's evidence of <br />financing of the Improvements on the Property as provided in Section 311.1 and such financing shall <br />be available for development of the Improvements or, to the extent said financing consists of a third <br />party loan or loans, said loan or loans shall have closed and funded or be ready to close and fund <br />concurrently with the Loans. <br />601.7 Final Project Budget and Construction Schedule. Developer shall have <br />submitted to Agency/City and Agency/City shall have approved the final/updated Project Budget and <br />updated construction schedule for the construction of Improvements. <br />25'127
The URL can be used to link to this page
Your browser does not support the video tag.