My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT - PROJECT DEV FOR SANTA ANA-GARDEN GROVE FIXED GUIDEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/07/2011
>
25K - AGMT - PROJECT DEV FOR SANTA ANA-GARDEN GROVE FIXED GUIDEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:51:41 PM
Creation date
3/3/2011 11:55:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25K
Date
3/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-1-2447 <br />EXHIBIT G <br />Small StartsNery Small Starts Reporting Checklist <br />The following checklist is provided to aid project sponsors in preparing applications to enter into <br />project development for Small Starts and Very Small Starts. Specific information and <br />instructions regarding reporting Templates, Standardized Cost Categories, Summit reports, <br />financial plans, etc., are provided in much greater detail in the FTA guidance at its website for <br />Nei- Starts Proiect Planning and Development. <br /> <br />Reporting Item <br />Required Information <br />Small <br />Starts Very <br />Small <br />Starts <br />Evidence of Basic Project Readiness <br />Alternatives Analysis Report Final Report <br />Selection of the Locally Preferred Alternative and <br />Adoption into Constrained Lon Range Plan Proof of local action <br />Agreement on Baseline Alternative FTA concurrence <br />Initial Information for Before and After Study Ridership and cost inputs and <br />estimates <br />NEPA Scoping (as appropriate to the NEPA Class of <br />Action) Scoping report or memorandum <br />evincing completion <br />Evidence of Sponsor Technical Capacity Preliminary Project Management Plan, <br />and/or other materials <br />Project Background <br />Project Description Project Description <br />Template <br />Make the Case Document Narrative, Data, Maps, Graphics <br />Certification of Technical Methods and Planning <br />Assumptions Signed <br />Certification <br />Project Maps <br />Project Site Map Map <br />Vicinity Map Map <br />Capital Costs <br />Standard Cost Categories, including schedule, inflation, <br />and funding SCC Worksheets <br />Annualized Cost Worksheets for Build and Baseline SCC Worksheets <br />Travel Forecasts* <br />User Benefits Forecasts Summit Reports <br />Thematic Maps and Legend Summit Output <br />Summary of Travel Forecasts Travel Forecast Template, Narrative, <br />Data as necessary) <br />O/M Costs <br />Summary of O&M Cost Productivities Narrative, Data <br />* Simplified travel forecasting procedures and results may be acceptable. Sponsors should discuss such procedures <br />with FTA. <br />Page 1 of 2 <br />25K-45
The URL can be used to link to this page
Your browser does not support the video tag.