Laserfiche WebLink
5`h and Main Parking Structure <br />Architectural scope of work: <br />AECOM will perform a 3-hour Field investigation to review the accuracy of the architectural as-built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of Level 2. <br />Review or improve the accessibility compliance of the parking structure is not in the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete two (2) one day site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described is $20,500 <br />Field Investigation $380 <br />Design and Construction Documentation $16,055 <br />Construction Phase Services $4,065 <br />5"' and Spurgeon Parking Structure <br />Architectural scope of work: <br />AECOM will perform a 3-hour Field Investigation to review the accuracy of the architectural as-built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of a new overhead <br />roll-up door at each existing vehicle entrance - a total of two (2) overhead roll-up doors <br />Review or improve the accessibility compliance of the parking structure is not in the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete two (2) 3-hour site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described Is $9,450 <br />Field Investigation $380 <br />Design and Construction Documentation $7,165 <br />Construction Phase Services $1,905 <br />The total proposed stipulated sum for the scope of work at all four (4)parking structures is $102 <br />760 <br />based on the following breakdown: , <br />P Street and Birch Parking Structure <br />3`d St <br />t <br />d B $32,350 <br />ree <br />an <br />roadway Parking Structure <br />"' $31,215 <br />5 <br />and Main Parking Structure <br />5"' <br />d $20,500 <br />an <br />Spurgeon Parking Structure $9,450 <br />Project Specification Manual $9,245 <br />Should the Owner request AECOM's participation at any construction meetings, we would be happy to <br />provide this service on a time and materials basis at an hourly rate of $125/hr. <br /> <br />'. AECOIvi <br />8OA-16