My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - VARIANCE - REDUCTION OF LANDSCAPE 1901 N TUSTIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
31A - VARIANCE - REDUCTION OF LANDSCAPE 1901 N TUSTIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:43 PM
Creation date
3/16/2011 5:57:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for Approval for Variance No 2011-01 <br />Should the Planning Commission approve Variance No. 2011-01, the approval is subject <br />to compliance, to the reasonable satisfaction of the Planning Manager, with all applicable <br />sections of the Santa Ana Municipal Code, the California Administrative Code, the <br />California Building Standards Code, and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this variance. <br />The applicant must remain in compliance with all conditions listed below throughout the life <br />of the variance. Failure to comply with each and every condition may result in the <br />revocation of the variance. <br />A. Planning Division <br />1. All proposed improvements must conform to the Site Plan Review approval <br />of DP No. 2010-39 and the staff report exhibits. <br />2. Any amendment to this variance must be submitted to the Planning Division <br />for review. At that time, staff will determine if administrative relief is <br />available or the variance must be amended. <br />3. Landscaping, once installed, shall be maintained per the approved <br />landscape plan. After project occupancy, landscaping is to be maintained <br />to include the minimum level of plant materials installed at the time of <br />occupancy and per the approved plan. <br />4. Prior to issuance of a certificate of occupancy, the parking lot needs to be <br />repaired and repaved per city standards. <br />5. The required trees shall be upgraded to 36-inch boxed size and shrubs <br />shall be upgraded to 5-gallon size throughout the project. <br />6. Vine pockets are required to be added along the south property line <br />abutting Armstrong Garden Center. <br />7. The roofing materials for the building shall be made of lightweight concrete <br />tiles or other suitable material as approved by staff. The exact material <br />shall be submitted to the Planning Division for approval. <br />(Modified by Planning Commission on February 28, 2011) <br />Exhibit A <br />31 A-19
The URL can be used to link to this page
Your browser does not support the video tag.