My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - CONSTRUCTION MGMT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
25E - AGMT - CONSTRUCTION MGMT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:41 PM
Creation date
3/17/2011 1:18:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Construction and phasing <br />The existing bridge consists of two separate structures: a north structure and a south <br />structure that were built at different times. It is crucial for f=irst Street to remain <br />operational during construction, so one through-lane in each direction will remain open <br />during construction. In addition to the bridge structure, the project will be completed with <br />the changing of the roadway approaches to meet the alignment of the new bridge. <br />Construction of the new bridge will occur in two phases starting with the north structure. <br />Work of this project consists of: <br />Phase 1: North Structure <br />Phase 1 begins with redirecting all traffic onto the existing south structure, one lane in <br />each direction. <br />Demolition <br />Demolition of portions of the north structure to include superstructure and foundation, <br />such as columns, wall piers, footings, and pile caps. The piles and drilled shafts of the <br />existing bridge structure will be cut off one foot below the channel invert. <br />Construction <br />Construction includes the placement of the new bridge foundation elements during dry <br />season as well as upper portions of the bridge superstructure, such as girders and <br />deck. Placement of the superstructure of the bridge is not required to be conducted <br />within the dry season. A new retaining wall will be built in the northeast quadrant of the <br />bridge. <br />Phase 2 :South Structure <br />After completion of the new portion of the bridge, traffic will be routed onto it, and the <br />south portion will be demolished. <br />Demolition <br />The Phase 2 demolition encompasses the same demolition activities as Phase 1, but <br />they will occur on the existing south bridge structure. <br />Construction <br />Phase 2 construction will encompass activities similar to Phase 1 but on the south <br />portion of the bridge. Also, a new retaining wall will be built in the southwest quadrant <br />of the bridge. <br />3 <br />25E-24