My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23E - PROJ - FIRST ST BRIDGE REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
23E - PROJ - FIRST ST BRIDGE REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:49:32 PM
Creation date
3/17/2011 4:53:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23E
Date
3/21/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MARCH 21, 2011 <br />CLERK OF COUNCIL USE ONLY: <br />TITLE APPROVED <br />CONTRACT AWARD FOR THE FIRST ? As Recommended <br />STREET BRIDGE REPLACEMENT ? Amended <br />? Or dinance on 1g` Reading <br />OVER THE SANTA ANA RIVER ? Ordinance on 2nd Reading <br />(PROJECT NO. 061723) ? Implementing Resolution <br />? Set Public Hearing For_ <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to Powell Constructors, Inc., the lowest responsible bidder, in accordance <br />with unit bid prices in the estimated amount of $6,010,329 for construction of the First <br />Street bridge replacement over the Santa Ana River effective Monday, March 28, 2011, <br />subject to compliance with all City rules and regulations. <br />2. Approve a funding analysis with a total estimated construction cost of $8,113,900. <br />DISCUSSION <br />Currently, the First Street Bridge over the Santa Ana River consists of two travel lanes in each <br />direction (Exhibit 1). This project will widen the bridge and the approaches to three lanes in each <br />direction, along with bike lanes and with pedestrian sidewalks on both sides to make this segment <br />of First Street consistent with the Orange County Master Plan of Arterial Highways and the City's <br />Circulation Element. <br />The proposed work includes demolishing the existing bridge and construction of a new, wider <br />bridge. Other improvements include medians, trail connections to the Santa Ana River and <br />landscaping along the approaches to the bridge. <br />The work will be conducted in two phases. In the first phase, traffic will be directed to the south <br />half of the bridge while the north half will be demolished and rebuilt. The second phase of the <br />project will start immediately following completion of the first phase. Traffic in this phase will be <br />directed to the newly completed north half of the bridge during construction of the south half. <br />Once completed, these improvements will enhance flow of traffic, pedestrian safety and ride <br />quality of the bridge. <br />23E-1
The URL can be used to link to this page
Your browser does not support the video tag.