My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
B & T WORKS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
B & T WORKS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:55:18 PM
Creation date
3/23/2011 1:46:16 PM
Metadata
Fields
Template:
Contracts
Company Name
B & T WORKS, INC.
Contract #
11-6744
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
1/23/2013
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BP2of14 <br />CITY OF SANTA ANA <br />PROJECT NO. 11 -6744: BRISTOL -17TH IlVTERSECTION WIDENING <br />PROPOSAL <br />Rc CONTRACT AGREEMENT <br />BID PROPOSAL continued <br />Item # <br />Bid Item <br />Unit <br />Quantit <br />Un Price <br />Amount <br />14. <br />PCC Sus Pad <br />SF <br />4,010 <br />/it <br />$ ��s <br />$ ?� S� <br />15. <br />PCC Catch Basin — W27' (Type C) <br />EA <br />1 <br />$ /� >(JU� <br />�Z-`_ <br />$_� �o <br />16. <br />PCC Pipe Collar <br />EA <br />1 <br />$�(�� <br />✓ <br />" <br />$ c� /� <br />17. <br />27" RCP (2000 -D) <br />LF <br />35 <br />$�� <br />� <br />$ T_�Rr_""'_� <br />/���(�� <br />18. <br />Furnish and Install New Water Valve <br />EA <br />7 <br />.moo <br />$ � � <br />C � <br />$ C SU <br />Frame and Cover to Finished Grade <br />19. <br />Adjust Existing Manhole Frame and <br />EA <br />1 <br />$ �p 5_�� <br />/� <br />$ (° s Cj <br />Cover to Finished Grade <br />20. <br />Adjust OCSD Manhole Frame and Cover <br />EA <br />6 <br />� <br />$�a� <br />.-" <br />$__�� <br />to Finished Grade <br />21. <br />Furnish and Install New No. 6 Pull Box <br />EA <br />12 <br />$ <br />$ •P <br />to Finished Grade <br />-i��� <br />22. <br />Furnish and Install New Water Meter <br />EA <br />4 <br />/��/ cam'-' <br />$�`d� <br />v J <br />$ <br />Frame and Cover to Finished Grade <br />23. <br />Construct New Fire Hydrant Assembly <br />EA <br />2 <br />a..+ <br />$ <br />�a <br />$ 7 �(/ <br />24. <br />Remove and Salvage Existing Fire <br />EA <br />2 <br />$�Vv_ <br />$ <br />Hydrant <br />_ <br />- -�� <br />25. <br />Date Palm Tree <br />EA <br />9 <br />/�� <br />$ Ui%o <br />� <br />$��(� <br />26. <br />Platanus Acerifolia (24" Box) <br />EA <br />5 <br />...� <br />$� <br />,.,� <br />$ ��(/ <br />gs <br />27. <br />Marathon II Sod <br />SF <br />3,625 <br />$ l <br />$ <br />28. <br />Irrigation System <br />LS <br />1 <br />$t`�J�`, ,� <br />$ p� p i A� <br />29. <br />60 Working Day Landscaping 8t <br />LS <br />1 <br />7 � <br />$ -3� <br />� � <br />$__ ,�� <br />Irrigation Maintenance Period <br />30. <br />Signal Modification <br />LS <br />1 <br />��� � ��j <br />$--- f��'t`c <br />' � , � <br />$��G <br />BP2of14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.