Laserfiche WebLink
Request for Approval of Change Order No. 1 <br />Project 11 -6744 <br />Request for Approval of Change Order No. <br />May 2, 2012 <br />Page 2 of 2 <br />2. The contract documents show installation of a new electrical service pedestal for <br />the irrigation controller on the eastside of Bristol south of 17th Street but do not <br />show a point of connection. The nearest location for connection to Southern <br />California Edison is a vault on the south side of 17th Street east of Bristol. This <br />compensates the contractor for potholing for utilities, trenching for and installing <br />approximately 500 LF of 3" conduit, backfilling and compacting the trench. (PCO 8) <br />AGREED COST = $38.30 LF <br />EXTRA WORK AT AGREED PRICES <br />The contract documents require installation of two 5' x 6' static warning signs to be <br />installed to notify traffic to expect delays due to the construction. Due to the large <br />volume of traffic, two more static signs are needed to notify traffic in each direction <br />of travel. This compensates the contractor for fabrication, installation and <br />maintenance of the signs for the duration of the project. (PCO 5) <br />AGREED COST = $ 3,457 <br />APPROVED AS TO FUNDS AND <br />ACCOUNTS: <br />r- <br />�'Q <br />Raul Godinez II, EAe6utive Director Francisco Gutierrez, Executive Director <br />Public Works Agency Finance and Management Services Agency I''v- <br />K:\construction\projects \11- 6744 \MEM RFA 01 CCO 1 <br />