Laserfiche WebLink
Project 11 -6744 <br />Request for Approval of Change Order No. 1 <br />May 2, 2012 <br />Page 2 of 2 <br />2. Due to the widening of the intersection of 17th and Bristol Streets, the contract <br />documents require all the traffic signal poles and equipment to be replaced with <br />exception of the northeast corner which is not being widened. The signal heads <br />on that corner are old and deteriorated; therefore Traffic Engineering has <br />requested that the signal heads on that corner be replaced with new LED signal <br />heads to match the remainder of the intersection. <br />Agreed Cost = $6,000 <br />EXTRA WORK AT TIME & MATERIALS <br />1. During trenching for the proposed 2" irrigation water service on the east <br />side of Bristol south of 17th Street, a 6' deep utility line was encountered. <br />This line had been backfilled with concrete; therefore the proposed 2" <br />service line will have to be installed below the conflicting utility. <br />Final Cost = $ 3,457 <br />APPROVED AS TO FUNDS AND <br />ACCOUNTS: <br />Raul Godinez II, ecutive Director Francisco Gutierrez, Executive Director <br />Public Works Agency Finance and Management Services Agency ,� <br />K= \construCtion\projects \1'1- 6744 \MEM RFA CCO #02 <br />