B & T WORKS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
B & T WORKS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:55:18 PM
Creation date
3/23/2011 1:46:16 PM
Metadata
Fields
Template:
Contracts
Company Name
B & T WORKS, INC.
Contract #
11-6744
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
1/23/2013
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 1 � -6744 <br />Request for Approval of Change Order No. 5 <br />December � 4, 207 2 <br />Page 2 of 2 <br />2. The City directed the contractor to construct an additional � � ,220 SF bus <br />turn -out on the northeast corner of Bristol and 17th Street. The cost of the <br />bus turn -out was covered by bid price line items; however, there was no <br />compensation allowed for traffic control to close one eastbound lane of � 7th <br />street to allow construction of the bus turn -out. This compensates the <br />contractor for all labor and equipment costs to provide, install, and maintain <br />traffic control for the duration of the construction of the additional bus turn- <br />out. <br />Agreed Price $ 7,240.32 <br />3. Per the direction given in PCO #8 the contractor installed SOOLF of conduit <br />to make the electrical service connection for the irrigation controller service <br />pedestal. Southern California Edison requires their own contractor to install <br />the wiring and make the final connections, thus delaying the completion of <br />the work. Due to the proximity of Santa Ana College the contractor was <br />directed to maintain the traffic control and barricading to ensure public <br />safety. This compensates the contractor for all labor and equipment costs to <br />provide, install, and maintain the traffic control and barricading until SCE <br />completed their portion of the work. <br />Agreed Price $ 9,626.02 <br />4. The contractor was directed in PCO #� 9 to import sand, backfill and <br />compact the unplanted palm tree excavations flush with the adjacent <br />sidewalk to ensure public safety until the palm trees are planted. This <br />compensates the contractor for all labor and equipment costs to import <br />sand, backfill, and compact the excavations. <br />Agreed Price $ 4,594.24 <br />APPR ED AS TO FUNDS AND ACCOUNTS: <br />Raul Go Inez I1, Executive rector Francisco Gutierrez, Executive Director <br />Public W s Agency Finance and Management Services Agency <br />K:\construction\projects \11- 6744 \MEM RFA CCO #OS <br />