9/28/ 1 O
<br />County of Orange, $6,168,750 "O'Neill Park Sewer Conversion"
<br />Contact: Mr. Rick Allen (714) 448 -8552 Start: October '06 - December '07 (on time)
<br />Project S� ■mmary: 12,594' of 8" PVC and DIP, T -lock Manholes, Wet Well Lift Station ($835K)
<br />City of Huntington Beach, $4,638,222 "OC -9 Water Transmission Main"
<br />Contact: Mr. Mike Hitt (714) 292 -2140 Start: December '05 - Complete: March '07 (on time)
<br />Project Summary: 12,152' of 24" DIP, Siphons, Blow -offs, Air -Vacs
<br />Los Angeles County Dept. of Public Works, $455,581 "Ditman Avenue Storm Drain"
<br />Contact: Mr. Johnny Oghoorian (626) 607 -7587 Start: Jan '07 - Complete: Feb '07 (on time)
<br />Project Summary: 926' of 48" and 24" RCP, Catch Basins, Manholes, Paving
<br />City of Fullerton, $1,987,032 "Lemon — Rosslynn Sewer"
<br />Contacts: Mr. Eliseo Bravo (714) 932 -7506 Start: July '06 - Complete: Oct'06 (on time)
<br />Contacts: Mr. Murdock Miralaie (714) 595 -6720
<br />Project Summary: 5537' of 21" and 8" VCP, Manholes, Jack 42" Casing, Paving
<br />Western Municipal Water District, $475,594 "Wood Road Irrigation Pipeline"
<br />Contact: Mr. Greg Alexander (951) 712 -6566 Start: Dec '05 - Complete: Jan '06 (on time)
<br />Project Summary: 2888' of 12" PVC, Blow -offs, Air -Vacs, Paving
<br />Golden Rain Foundation, $139,265 "Perimeter Wall Project, Section G&H"
<br />Contact: Mr. Carlos Martinez (562) 431 -6586 ( #371) Start: Dec '05 - Complete: Jan '06 (on time)
<br />Project Summary: 3127' of Perimeter Block Wall
<br />Los Angeles County Dept. of Public Works, $2,147,168 "Kenneth Hahn Storm Drain"
<br />Contact: Mr. Mark Bruschaber (818) 370 -3881 Start: Nov '05 - Complete: July '06 (on time)
<br />Project Summary: 461' of Tunnel for 60" RGRCP, Jack 432' of 42" RGRCP, Soil Remediation
<br />City of Huntington Beach, $230,865 "Residential Storm Drain"
<br />Contact: Mr. Jeff Gibbons (714) 401 -5008 Start: Sept '06 - Complete: Oct '06 (on time)
<br />Project Summary: Flat Work, Paving, Cross Gutters, Ped Ramps
<br />City of San Clemente, $1,066,744 "Calle Las Bolas Storm Drain"
<br />Contact: Mr. Gary Voborsky (949) 279 -9730 Start: May '05 - Complete: Aug '05 (on time)
<br />Project Summary: 2148' of RCP, 1369' of 8" PVC (Water), Catch Basins, Manholes, Paving
<br />Los Angeles County Dept. of Public Works, $493,082 "112th Street Replacement"
<br />Contact: Mr. Joe Baker (562) 405 -5715 Start: Aug '05 - Complete: Sept '05 (on time)
<br />Project Summary: Street Replacement, Flat Work, AC Paving
<br />City of Palos Verdes Estates, $77,500 "Beach Club Access Retaining Wall"
<br />Contact: Mr. Jim Pugh (805) 602 -0891 Start: Sept '05 - Complete: Oct '05 (on time)
<br />Project Summary: Reinforced Concrete Piles for Retaining Wall
<br />County of Orange, $189,479 "Federal Storm Channel"
<br />Contact: Mr. Rick Allen (714) 448 -8552 Start: Nov '05 - Complete: Nov '05 (on time)
<br />Project Summary: Reinforced PCC Channel Lining
<br />Los Angeles County Dept. of Public Works, $179,915 "Private Drain 996 (Victoria St.)"
<br />Contact: Mr. Rene Bracamontes (310) 487 -9254 Start: Jun '05 - Complete: Jul '05 (on time)
<br />Project Summary: 6'W X 24 "H DBL RCB Channel, Transition Structure