My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (CITYWIDE RESIDENTIAL STREET REPAIR - PHASE 15)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (CITYWIDE RESIDENTIAL STREET REPAIR - PHASE 15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:54:17 PM
Creation date
3/23/2011 2:16:16 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (CITYWIDE RESIDENTIAL STREET REPAIR - PHASE 15)
Contract #
11-7509
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
11/27/2012
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Claudia C. Alvarez <br />COUNCILMEMBERS <br />David Benavldes <br />CaAos Bustemante <br />Michele Martinez <br />Vincent F. Sarmiento <br />Sal Tinaiero <br />February 17, 201 1 <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 7 98B <br />Santa Ana, Callfomla 92702 <br />CITY MANAGER <br />David N_ Ream <br />CITY ATTORNEY <br />Joseph W_ Fleh3ier <br />CLERK OF THE COUNCIL <br />MaAa D. F4dzer <br />ADDENDUM No. ONE <br />SUBJECT: PROJECT No. 77-7509: Citywide Residential Street Repair -Phase 15 <br />The following change has been made to specifications of the subject project: <br />Specifications <br />1. Page 19, Section 2.09 PULVERIZE & CEMENT-TREAT EXISTING A C BASE <br />AND SUBGRADE. Revise the second paragraph of CEMENT APPLICATION <br />section to read as follows: <br />"The cement content shall be 5% (five-percent) based on the dry unit weight of <br />the pulverized material. The dry unit weight of the pulverized material shall be <br />determined by California Test 312 (Design and Testing of Classes A and B <br />Cement Treated bases) Appendix L. At least 15 working days prior to beginning <br />the pulverization and cement treat operation, the contractor shall submit cement <br />treated mix design from core samples to the Engineer. The mix design shall be <br />prepared under the supervision and signed by an Engineer licensed by the state <br />of Califomia. The contractor shall determine the rate of cement content to be <br />added to the pulverized material as part of the mix design. The Engineer may <br />order an increase or decrease in the specified cement content when conditions <br />warrant such action. For bidding purposes, the cement content is assumed to <br />be 5.0 percent and dry unit weight of 130 pounds/ cubic feet." <br />All other terms and conditions remain the same. <br />FOR THE CITY F SANTA ANA <br />.i' / <br />a/' ? ? JCV? <br />George Alvarez <br />City Engineer
The URL can be used to link to this page
Your browser does not support the video tag.