Laserfiche WebLink
MEMORANDUM <br />MEMORANDUM <br />Paul Walters <br />To: Interim City Manager Date: January 19, 2012 <br />Raul Godinez II, Executive Director <br />From: Public Works Agency <br />PROJECT NOS. 09 -1752 & 11 -6407 <br />BRISTOL WARNER INTERSECTION WIDENING AND SA -4 VAULT RELOCATION <br />Subject: CHANGE ORDER NO. 2 <br />Contractor: Hillcrest Contracting Inc. <br />1467 Circle City Dr <br />Corona, CA 92879 <br />Project Description: Bristol Warner Intersection Widening and SA -4 Vault Relocation <br />Change Order Number: 2 <br />Accounting Unit - Account - Activity Number: 06617647 - 66301 - 11640701028 <br />Original Contract: $1,215,538 <br />% of Original <br />Amount of This <br />Change Order: $ 67,497.84 5.55% <br />Previously Approved <br />Change Orders: $ 28,000.29 2.30% <br />Total Change Orders: $ 95,498.13 7.85% <br />REASON FOR CHANGES <br />1. Metropolitan Water District requested to modify their proposed electrical service <br />cabinet by adding a second circuit to separate the sump pump power supply from <br />the metering equipment. The sump pump power requirements may cause the <br />metering equipment to malfunction. Therefore it is recommended to add the <br />second circuit breaker, additional wiring and perform the cabinet modifications. <br />(PCO 12) <br />AGREED COST= $434.50 <br />