MEMORANDUM <br />Paul Walters <br />To: Interim City Manager <br />Raul Godinez 11, Executive Director <br />From: Public Works Agency <br />Date: March 15, 2012 <br />PROJECT NOS. 09 -1752 & 11 -6407 <br />BRISTOL WARNER INTERSECTION WIDENING AND SA -4 VAULT RELOCATION <br />Subject: CHANGE ORDER NO. 4 <br />Contractor: Hillcrest Contracting Inc. <br />1467 Circle City Dr <br />Corona, CA 92879 <br />Project Description: Bristol Warner Intersection Widening and SA -4 Vault Relocation <br />Change Order Number: 4 <br />Accounting Unit - Account- Activity Number: <br />Original Contract <br />Amount of This <br />Change Order: <br />Previously Approved <br />Change Orders: <br />$1 ,215,538 <br />$ 51 ,61 O <br />$ 115,651 <br />Total Change Orders: $ 167,261 <br />REASON FOR CHANGES <br />06617647- 66301 -1 1640701028 <br />of Original <br />4.24% <br />9.50% <br />13.7 %� <br />"Contingency was increased to 30.5% <br />On the northeast corner of the intersection of Bristol Street and Warner Avenue, <br />there is an existing Metropolitan Water District metering station with two vent <br />stacks, one located at the metering station and one in the median on Warner <br />west of the intersection. Due to the street widening these facilities need to be <br />relocated, the contract documents call for relocation by others; after construction <br />started it was concluded that it would be more cost and time effective to have <br />them relocated under this contract. This cost includes: relocation of the metering <br />cabinet and vent stacks, installing concrete encased electrical conduits and vent <br />pipes, installing water metering and sump pump piping. Also included in the cost <br />is a new electrical service cabinet and wiring to separate MWD electrical power <br />supply from City power supply. <br />AGREED COST = $ 51 ,61 O <br />