Laserfiche WebLink
CITY OF SANTA ANA <br />- - PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 09 -1752; BRISTOLNVARNER INTERSECTION WIDENING Change Order Number 4 <br />AND SAS VAULT RELOCATION <br />To Hillcrest Contracting, Inc. contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />spec cations on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance wi II be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />Relocate the Metropolitan Water District metering station located on the northeast <br />corner of Bristol Street and Warner Avenue from vehicle travel lanes to the sidewalk <br />area_ This cost includes: relocation of the metering cabinet and vent stacks, installing <br />concrete encased electrical conduits and vent pipes, installing water metering and <br />sump pump piping. Also included in the cost is a new electrical service cabinet and <br />wiring to separate MWD electrical power supply from City power supply_ <br />Page 1 of 2 <br />AGREED COST = $ 51 ,61 O <br />