My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
FULL PACKET_2011-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:35:45 PM
Creation date
3/23/2011 2:49:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELs 11/20/92 <br />This Agreement for IMPLEMENTING ROADWAY AND INTERCHANGE <br />MITIGATION PROGRAM ( "Agreement ") is made and entered into as of <br />yCi . <br />this *AY day of 1992 (the "Effective Date "), by <br />and between the City of Irvine, a California charter city <br />( "Irvine ") and the City of Santa Ana, a California municipal <br />corporation ( "Santa Ana") (collectively referred to as the <br />"Parties ") . <br />RBr„I TALS <br />A. Irvine has certified Environmental Impact Report 88 -ER- <br />0087 (the "IBC SIR"), as adequate and complete and adopted General <br />Plan Amendment No. 7234 -GA, and Zoning Amendment 88 -ZC -0135 <br />.(collectively the "IBC Rezoning") to amend the land use designation <br />and zoning in that portion of the. City known as the Irvine Business <br />Complex (the "IBC "), more specifically defined as that area <br />depicted on Exhibit "A," attached hereto and incorporated herein by <br />this reference. <br />B. The IBC EIR analyzes the IBC Rezoning and concludes that <br />the mitigation measures contained therein will adequately <br />accommodate the traffic impacts which are anticipated to be <br />generated by the IBC Rezoning. <br />C. Certain mitigation measures discussed in the IBC EIR and <br />adopted as part of the IBC Rezoning are Roadway and Interchange <br />Improvements which are to be constructed within the municipal <br />boundaries of Santa Ana. <br />F32%131 %0631740345\2022912.1 11130/92 1 <br />EXHIBIT A <br />25B -15 <br />.�l <br />
The URL can be used to link to this page
Your browser does not support the video tag.