Laserfiche WebLink
Paul Walters <br />fo: IntedmCityManager Dale; September 13, 2011 <br />Raul Gotlinez II, Ezecudve Director <br />Rrom: <br />WayxsAgency <br />REQUEST FOR APPROVAL OF CHANGE ORDER N0.2; <br />Subject: PROJECT N0.08.1723; FEDERAL PROJECTgBRIS•5083 (099) <br />Cantracton ParrellConstmctors <br />65558ananaAvullue <br />Fontana, CA 92335 <br />Project Description: First Sheet Bdtlge Replacement over the Sant Ana River <br />Change Order Number 2 Amount, $151,666 <br />Public <br />Aaaunt Unit 03217880 AccamC 66220 Actvlty; 08172302028 <br />OdginelContractCosC $6,010,329 <br />%of Odginal <br />Amount of The <br />Change0rder: $157,866 2.890 <br />PrevioustyApprovad 488,882 7,8 <br />Change Orders, <br />TotalChaoge0�ere: $826,588 104� <br />REASON FOR CHANGE <br />A. When ddving steel piles at abuhnent no. one on the west side of �e bddge, if was <br />discovered that the remaining footing of the pier at south side of the old bddge was <br />interfered vaiU the new piles. The tlesipn engineer has revised the plan by adding hvo <br />more piles and extending the pile cap to cover them. This change order provides for <br />extending the pile cap, adtli9onal excavafron, fo�minp, rebers and steel piles. It also <br />includes compensation to the contractor for downtime of the pile driving machine during <br />d�a re•design, Pdor approval for this change oNer was grenfed on Ruguat 22, 2011. <br />TOTAL COST =$88,693 <br />B, Before erecting the girders far the new bddge, tr�ree overhead communication lines were <br />found to be in con6id with canes used to lift and set fire girders. The antrectar hired a <br />subcontractor wh�h is approved by the communication campaDies to temporary remove <br />qte Imes daily tludng selling the girders. This change order pmvides for temporary <br />removing end placirM back the lines daily and markup to the pdme contractor. <br />RGREED PRICE= $66,993 <br />