My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Paul Walters <br />To: Interim City Manager <br />From: <br />Subject: <br />Raul Godinez II, Executive Director <br />Public Works Agency <br />-_�_ <br />Date: March 26, 2012 <br />REQUEST FOR APPROVAL OF CHANGE ORDER NO. 5; <br />PROJECT NO. 06 -1723; FIRST STREET BRIDGE REPLACEMENT OVER THE SANTA ANA <br />RIVER; FEDERAL PROJECT #BRCS -5063 (089) <br />Contractor: <br />Project Description: <br />Account Unit: 03217660 <br />Original Contract Cost: <br />Amount of The <br />Change Order: <br />Previously Approved <br />Change Orders: <br />Total Change Orders: <br />REASON FOR CHANGE <br />Powell Constructors <br />8555 Banana Avenue <br />Fontana, CA 92335 <br />First Street Bridge Replacement over the Santa Ana River <br />Account: 66220 Activity: 06172302028 <br />$6,010,329 <br />of Original <br />$175,000 2.91 <br />$885,527 14.73% <br />$1 ,060,527 17.64% <br />The coordination effort between the City and Southern California Edison's (SCE) to de- energize <br />nigh voltage transmission and distribution lines above the north side of the bridge was critical for <br />the contractor to install the new concrete girders. Due to the size of the cranes and the location of <br />the lines it was not possible to install the fifteen girders, for the north half of the bridge, without de- <br />energizing SCE's lines. <br />Following several coordination meetings with SCE, they agreed to a three -day window from Sam to <br />3pm to de- energize the lines contingent on the energy demand on the grid. The transmission lines <br />over the bridge are a critical component to the southwest grid. Consequently, when the energy <br />demand is high it is not possible for SCE to de- energize these lines without interrupting service on <br />the grid. Therefore, SCE advised that the de- energizing window may fluctuate with the energy <br />demand on the grid. <br />The first day, due to weather forecast, SCE was not able to de- energize the lines until lam, which <br />caused a two hour delay to the contractor. The second day went well and SCE was able to de- <br />energize the lines as planned. However, the third was eventually cancelled due to the extreme hot <br />weather. The contractor was on standby for approximately four hours before it was confirmed that <br />SCE was not able to de- energize the lines; which caused the rescheduling of the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.