My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 12:03:57 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
7/24/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • • <br />CITY COUNCIL MEETING DATE: <br />JUNE 3, 2013 <br />TITLE: <br />CONTRACT INCREASE TO ADD <br />STREETLIGHTS TO FIRST STREET <br />BRIDGE REPLACEMENT OVER THE <br />SANTA ANA RIVER (PROJECT NO. <br />061723) , „/ °) <br />*Ii] IT, Iin14n�7��7s�i��[�7�1 <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED 3i 02013 <br />�✓j As Recommended <br />❑ As Amended <br />❑ Ordinance on 1s' Reading <br />❑ Ordinance on 2nd Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />Increase the contract with Powell Constructors, Inc., for the construction of the First Street <br />bridge replacement over the Santa Ana River by $250,000 for a total estimated contract amount <br />of $8,065,000, and authorize the City Manager to execute change orders in an amount not to <br />exceed the authorized contingency. <br />DISCUSSION <br />On March 21, 2011, the City Council awarded a construction contract for the First Street bridge <br />replacement over the Santa Ana River to Powell Constructors, Inc., in the amount of $6,010,329 <br />plus a contingency amount of $1,202,066, totaling $7,212,395. On January 17, 2012, the City <br />Council approved an increase of $602,605 which raised the contract total to $7,815,000. <br />The additional costs were related to a significant redesign of the bridge foundations that <br />eliminated conflicts with interfering power lines, resulting from the inability of the utility company <br />to de- energize and relocate its lines. The restriction of constructing the bridge one -half at a time <br />and only during the dry season (six months), as determined by the Orange County Flood <br />Control District, caused scheduling delays that also affected contract costs. Other extra costs <br />were attributed to added enhancements to the bridge, including architectural details to the <br />railings, erecting sound walls, and for general unforeseen underground conditions. <br />Fortunately, due to unpredictability of the highly competitive construction market, the original <br />construction bids were significantly lower than the engineer's cost estimate. That resulted in <br />making additional grant funds available to the project for eligible scope expenditures. Even with <br />major redesign efforts and cost increases to the project, approximately $500,000 in grant <br />funding is still available for this bridge construction project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.