My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 12:03:57 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Expiration Date
7/24/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />To: <br />From: <br />David Cavazos <br />City Manager <br />William Galvez, Interim Executive Director <br />Public Works Aaencv <br />Project No. 06 -1723; First Street Bridge <br />Replacement over the Santa Ana River; <br />Federal Project #BRLS -5063 (089) <br />Subject: Change Order No. 8 <br />Date: Jan <br />2. 2014 <br />Contractor: Powell Constructors <br />8555 Banana Avenue ; v, <br />Fontana, CA 92335 " <br />Project Description: First Street Bridge Replacement over the Santa Ana River <br />Change Order Number: 8 Change Order Amount: $ 232,237.00 <br />Accounting Unit- Account - Activity Number: 0591776 66220 06172302028 <br />JUSTIFICATION <br />1. Increase limits of asphalt removal and replacement including the cost of traffic control. <br />Relocate an existing water meter to behind the new curb and gutter to meet City <br />Standards. At the request of Orange County Public Works Department, install redwood <br />headers adjacent to new pavement on access ramp to Santa Ana River Bike Trail to <br />prevent future damage to the pavement. (PCO 40) <br />AGREED PRICE = $17,258 <br />2. After Southern California Edison poles and streetlights were relocated as part of the bridge <br />widening, it was determined that there were not enough streetlights adjacent to the bridge <br />to provide adequate lighting on the bridge for pedestrian and motorist safety. In keeping <br />with the Council's request to maintain the historical integrity of the bridge, 20 vintage style <br />streetlight posts will be installed along both sides of the street on the bridge and the <br />approach to the bridge. The pilasters on the barrier rail along the bridge need to be <br />enlarged and reinforced to accommodate the new streetlight poles. <br />On the southwest approach to the bridge there is a 6' high block wall that is prone to <br />graffiti. It has been determined that to best mitigate the graffiti, a planter should be <br />constructed, irrigation lines installed and vines planted along the wall. (PCOs 41 & 42) <br />AGREED PRICE = $208,564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.