My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWEL CONSTRUCTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
POWEL CONSTRUCTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 5:32:13 PM
Creation date
3/23/2011 3:02:22 PM
Metadata
Fields
Template:
Contracts
Company Name
Powell Constructors, Inc.
Contract #
06-1723
Agency
Public Works
Council Approval Date
3/21/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 2 (March 8, 2011) <br />CITY OF` SANTA ANA <br />PROJECT 06 -1723: FIRST STREET BRIDGE REPLACEMENT PROJECT <br />PROPOSAL 8c CONTRACT AGREEMENT <br />BID PROPOSAL. continued <br />Item # <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />34. <br />Stamped Concrete Brick Pattern <br />SF <br />1,925 <br />$ <br />S - <br />$ 9loaS -- <br />35. <br />24" Box Tree <br />EA <br />14 <br />$ <br />3a� - <br />$ � -tiro -- <br />36. <br />Irrigation System <br />LS <br />1 <br />$ <br />t_s <br />$ ��.- <br />37. <br />Landscaping <br />LS <br />1 <br />$ <br />+-s <br />$ ��.- <br />38. <br />Landscape Maintenance Period <br />LS <br />1 <br />$ <br />�-S <br />$ S'GY.b •� <br />39. <br />(F) Bridge Removal <br />LS <br />1 <br />$ <br />+� <br />$ 3�{0,�.� <br />40. <br />(F) Structure Excavation (Bridge) <br />CY <br />939 <br />$ <br />toc�.- <br />$ a1'�'ioo <br />41. <br />(F) Structure Backfill (Bridge) <br />CY <br />202 <br />$ a-QO -' <br />$ '- 1��eao - <br />42. <br />Earth Retaining Structure (MSE Wall) <br />SF <br />5,229 <br />$ <br />go�` <br />$ '- t►ZS3�o.- <br />43. <br />Retaining Wall Type SSWB <br />SF <br />321 <br />$ <br />��to.- <br />$ '- t�k9+to - <br />44. <br />Furnish Piling (Class 90) <br />LF <br />868 <br />$ <br />a5.- <br />$ 9- t'�cn -- <br />45. <br />Drive Pile (Class 90) <br />EA <br />16 <br />$ <br />3�0 - <br />$ '��r�o <br />46. <br />Furnish Piling (Class 140) <br />LF <br />8,169 <br />$ <br />�•- <br />$ ao�4,a2S.- <br />47. <br />Drive Pile (Class 140) <br />EA <br />120 <br />$ <br />30� - <br />$ 3��D _ <br />48. <br />Prestressing Steel (Post- Tensioned) <br />LS <br />1 <br />$ <br />t-g <br />$ �� -� <br />49. <br />(F) Structural Concrete, Bridge <br />CY <br />287 <br />$ <br />Ste•- <br />$ t5Z8�'77.- <br />Footing <br />50. <br />(F) Structural Concrete, Bridge <br />CY <br />2;398 <br />$ <br />SSD - <br />$ 1 .?��g qoo. - <br />51. <br />(F) Structural Concrete, Approach <br />CY <br />204 <br />$ <br />to � •` <br />$ 13� .�. J <br />Slab (Type N30S) <br />52. <br />Furnish Precast Prestressed Concrete <br />EA <br />30 <br />$ �•�iocsD.� <br />$ "I�o,czxa� <br />Bulb -Tee Girder (100' -120') <br />BP3OF29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.