Laserfiche WebLink
Additional Assumptions: <br />• The project description and details remain as reflected in the Draft EIR that has been <br />prepared by URS. If the project description changes, URS reserves the right to assess <br />those changes and adjust its scope of work and fee proposal accordingly for <br />reconsideration by the City. <br />• Except as noted otherwise herein, none of the technical studies and analyses already <br />approved by the City [e.g., Cultural Study Report (Discovery Works, Inc. September <br />2008), etc.] for this project will need to be updated for inclusion in the EIR. <br />• This proposal assumes, as stated in Task 7, that one staff member (e.g., Beth Padon) from <br />Discovery Works, Inc. will attend the public meeting on the Draft EIR; this would not <br />include an architectural historian (e.g., Foothill Resources Ltd., subconsultant to <br />Discovery Works, Inc.). <br />• The proposal does not include efforts associated with obtaining any permits. <br />• This proposal does not include any project -required filing fees. <br />Project Schedule <br />With regards to project schedule, and for the purposes of this proposal as noted above, it is <br />assumed that the project duration will be 8 months. Once notice to proceed is received from the <br />City, USR will coordinate with the City to develop a detailed schedule identifying key milestone <br />dates. <br />Cost Estimate <br />The time -and -materials cost estimate to perform the work described herein is $48,335.00. <br />Attachment A includes the detailed fee estimate. <br />Should you have any questions regarding this proposal, please call me at (714) 835-6886. <br />Sincerely, <br />URS CORPORATION <br />P 'ec anag Vice President <br />Attachment A — Fee Proposal <br />