My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Study Methodology <br />analysis zone (TAZ) system which encompasses the five (5) counties in the Southern California region. <br />The primary focus of the modeling area is Orange County. <br />The OCTAM 3.3 model uses the latest adopted demographic forecasts, commonly referred to as <br />Orange County Projections, adopted in 2006 (OCP-2006). The OCP-2006 demographic forecasts <br />include data in 5 year increments through 2035 and are the official Orange County forecasts. The <br />growth in housing, population, and employment included in the OCP-2006 demographic projections is <br />consistent with the anticipated growth that is expected in conjunction with the cities' General Plan land <br />use and circulation elements. <br />The latest OCTAM 3.3 model data were used as the basis for producing the refined 2035 future <br />intersection turning movement volumes based on the algorithm obtained from the report Highway <br />Traffic Data for Urbanized Area Project Planning and Design (National Cooperative Highway Research <br />Program Report 255, Transportation Research Board, 1982, pp. 105-109), commonly referred to as <br />NCHRP-255. Minor manual adjustments have been conducted for traffic flow conservation and <br />reasonableness checks. Appendix C includes the initial refined 2035 turning movement volumes for <br />each intersection from the OCTAM model based on the NCHRP-255 methodology. <br />Significant Impact Criteria <br />The City of Santa Ana, City of Costa Mesa, and City of Irvine have similar but slightly different significant <br />impact criteria to identify intersections that can be categorized as either satisfactory or deficient, so that <br />appropriate mitigation measures can be made for non-satisfactory intersections to bring them to <br />satisfactory operating conditions. The City of Santa Ana's project impact analysis criteria indicate: <br />• A significant project impact occurs when the ICU value increases by greater than .01 and achieves <br />unacceptable level of service ("E" or "F). <br />Since no relevant unsignalized intersections are included in the study, the criteria for unsignalized <br />intersections are not listed herein. <br />The significant impact criteria provided above are based on the City's General Plan. In addition, projects <br />must also comply with the Orange County Congestion Management Plan (CMP) criteria. The CMP <br />specifies that a project cannot be allowed to reduce level of service or increase flow by more than 3% at <br />a location that is forecast to experience Level of Service E or F, generally. This criterion is generally less <br />stringent than the City's criteria, so any project that meets the City General Plan criteria will also <br />normally meet the County CMP criteria. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING 6 ENGINEERING 7 Traffic Impact Study in City of Santa Ana <br />75B-139
The URL can be used to link to this page
Your browser does not support the video tag.