My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Conditions <br />Existing Peak Hour Intersection Level of Service <br />The study area was observed during both the morning and the evening peak hours. The indicated levels <br />of service shown in Table I are representative of observed traffic conditions in the study area. <br />Appendix D contains the level of service analysis worksheets for Existing Conditions. <br />Table I - AM/PM Peak Hour Intersection Analysis <br />Existing Conditions <br />Signalized Intersections AM Peak Hour PM Peak Hour <br />LOS <br />d"Ey" <br />ICU Method ICU/LOS ICU/LOS OK <br />Main Street at Dyer Road 0.669 / B 0.815 / D <br />Main Street at MacArthur Boulevard 0.665 / B 0.679 / B x <br />Main Street at Sandpointe Avenue 0.297 / A 0.469 / A <br />Main Street at Sunflower Avenue 0.393 / A 0.704 / C <br />MacArthur Place at MacArthur Boulevard 0.687 / B 0.674 / B x <br />SR-55 SB Ramps at MacArthur Boulevard 0.694 / B 0.616 / B x <br />SR-55 NB Ramps at MacArthur Boulevard 0.757 / C 0.633 / B <br />Red Hill Avenue at MacArthur Boulevard 0.558 / A 0.791 / C x <br />HCM Method Delay/LOS Delay/LOS <br />SR-55 SB Ramps at MacArthur Boulevard 18.9 / B 17.1 / B X <br />SR-55 NB Ramps at MacArthur Boulevard 19.6 / B 16.7 / B <br />w - 1-iwcuun Capacky uuuzaTion, Delay is in seconds/vehicle, LOS = Level of Service <br />As shown in Table I, all study intersections operate at an acceptable level of service during the AM and <br />PM peak hours for Existing Conditions. <br />Figure 4 illustrates the Existing (2010) AM/PM peak hour traffic volumes. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING 8 ENGINEERING I I Traffic Impact Study in City of Santa Ana <br />75B-143
The URL can be used to link to this page
Your browser does not support the video tag.