My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Opening Year (2013) Without Project Conditions <br />This section documents the analysis for the Opening Year (2013) Without Project conditions. Opening <br />Year (2013) traffic increases were derived using the existing (2010) traffic volumes plus 1% annual <br />growth rate from 2010 to 2013. <br />Opening Year (2013) traffic increases also considers additional traffic that may be generated by other <br />developments that have been approved. KOA and the City identified one relevant project near the <br />project site which will add traffic to the intersections analyzed in the study. Table 2 lists the cumulative <br />project that was analyzed as part of this study per City direction. <br />Table 2 - Cumulative Project <br />ID No. Location Project <br />1 1501 West MacArthur Boulevard 9,800 square feet of commercial use <br />Source: City o f Santa Ana Planninn Deoartment_ <br />The trip generation and distribution attributed to this cumulative project is documented in Appendix E <br />of this report. The trips generated by the cumulative project are included in the Opening Year (2013) <br />traffic forecast. <br />Figure 5 shows the cumulative project location. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING R ENGINEERING 13 Traffic Impact Study in City of Santa Ana <br />75B-145
The URL can be used to link to this page
Your browser does not support the video tag.