My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project-related traffic consists of trips on any portion of the street system that will begin or end at the <br />project site as a result of the development of the proposed project. Project-related traffic is a function <br />of the extent and type of development proposed for the site. This information is used to establish <br />traffic generation for the site. <br />Project Trip Generation <br />Trip generation is a measure or forecast of the number of trips that will be made to or from the project. <br />It is generally equal to the traffic volume expected at the project entrance. The project trip generation <br />has been calculated in accordance with the Institute of Transportation Engineers (ITE) publication Trip <br />Generation (8th Edition, 2008). Table 5 presents the trip generation rates. Daily and peak hour trip <br />generation for the project site under Opening Year (2013) and Long Range (2035) conditions is shown <br />in Table 6. <br />As indicated for the Opening Year (2013) conditions, with a total of 300 dwelling units of condominium, <br />175 condominium units to be "for-rent" units, and a 185 room business hotel, the proposed project <br />under Opening Year (2013) conditions generates approximately 3,632 daily trips with 277 AM peak <br />hour trips and 315 PM peak hour trips. <br />For the Long Term (2035) conditions, with a total of 450 dwelling units of condominium (300 dwelling <br />units of 5 story condo plus 150 dwelling units of Cinema Tower), 175 condominium units to be "for- <br />rent" units, and a 185 room business hotel, the proposed project under Long Range (2035) conditions <br />generates approximately 4,227 daily trips with 326 AM peak hour trips and 370 PM peak hour trips. <br />The proposed project trip generation calculations are presented in Appendix H of this report. <br />Table 5 - Project Trip Generation Rates' <br /> ITE PEAK HOUR <br />LAND USE QUANTITY2 AM PM <br /> CODE DAILY <br /> IN OUT TOTAL IN OUT TOTAL <br />Condominium <br />Project (5 story 230 300 DU 0.07 0.37 0.44 0.35 0.17 0.52 5.81 <br />condo) <br />Lake Towers <br />(High-rise 222 175 DU 0.08 0.22 0.30 0.21 0.14 0.35 4.20 <br />Apartment) <br />Condominium <br />Project (Cinema 232 150 DU 0.06 0.28 0.34 0.24 0.14 0.38 4.18 <br />Tower) <br />- <br /> 185 Occupied <br />Business Hotel <br />F 312 <br />0.3T <br /> <br />. <br />24 <br /> <br /> <br />.58 <br /> <br /> <br />.37 <br /> <br /> <br />.25 <br /> <br /> <br />.62 <br /> <br />7 <br />27 <br /> I <br />Rooms <br />. <br />Note I: Source: ITE (Ins titute of Tran sportation Engineers) T rio Gen eration Ma nual- a Fdiri- ')W Pd - 1• Ell I . A-11I.... , t.. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING & ENGINEERING 19 Traffic Impact Study in City of Santa Ana <br />75B-151
The URL can be used to link to this page
Your browser does not support the video tag.