My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Trips <br />Project Trip Distribution <br />Figure 8 through Figure I I illustrate the anticipated project inbound and outbound trip distribution <br />pattern for the estimated opening year and long range conditions, extracted from the previous approved <br />traffic study. These figures indicate the proportion of project traffic that will use the street segments <br />and turning movements indicated. According to the previous report, the distribution was originally <br />obtained from the OCTAM model select zone model run. The key difference between the opening year <br />and long range distribution is that an Alton Avenue overpass is proposed at the SR-55 freeway with <br />direct connections to the SR-55 HOV lanes. The HOV interchange was not implemented in project <br />opening year but is to be included in the long range condition. The traffic which will utilize Alton <br />Avenue and the HOV interchange in long range conditions was manually distributed to the parallel <br />roadway - MacArthur Boulevard. <br />The AM and PM peak hour project-only traffic volumes for the Opening Year (2013) are shown in <br />Figure 12 while the AM and PM project-only traffic volumes under the Long Range (2035) Conditions <br />are shown in Figure 13. Future traffic levels in the project vicinity are expected to be changed by the <br />amounts shown on these figures. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />' PLANNING 8 ENGINEERING 21 Traffic Impact Study in City of Santa Ana <br />75B-153
The URL can be used to link to this page
Your browser does not support the video tag.