My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This section documents the analysis for Opening Year (2013) With Project conditions. Table 7 <br />summarizes the result of the level of service analyses for this scenario. Figure 14 illustrates the Opening <br />Year (2013) With Project AM/PM peak hour traffic volumes, which are generated by adding the Opening <br />Year project only volumes to the Opening Year (2013) Without Project volumes. <br />Appendix I contains the analysis worksheets for the Opening Year (2013) With Project conditions. <br />Table 7 - AM/PM Peak Hour Intersection Analysis <br />Opening Year (2013) With Project Conditions <br />Signalized Intersections AM Peak Hour PM Peak Hour LOS "E" <br />ICU Method ICU/LOS ICU/LOS OK <br />Main Street at Dyer Road 0.692 / B 0.840 / D <br />Main Street at MacArthur Boulevard 0.688 / B 0.710 / C x <br />Main Street at Sandpointe Avenue 0.328 / A 0.485 /A <br />Main Street at Sunflower Avenue 0.415 / A 0.740 / C <br />MacArthur Place at MacArthur Boulevard 0.744 / C 0.707 / C X <br />SR-55 SB Ramps at MacArthur Boulevard 0.734 / C 0.658 / B X <br />SR-55 NB Ramps at MacArthur Boulevard 0.793 / C 0.669 / B <br />Red Hill Avenue at MacArthur Boulevard 0.580 / A 0.819 / D x <br />HCM Method Delay/LOS Delay/LOS <br />SR-55 SB Ramps at MacArthur Boulevard 19.6 / B 18.1 / B x <br />SR-55 NB Ramps at MacArthur Boulevard 20.4 / C 17.4 / B <br />- -_r.y ?_...-....-... --....y .. ................... c... - ?...a - mac- v oe, Vice. <br />As indicated on Table 7, all intersections will operate at acceptable levels of service for the Opening <br />Year (2013) With Project conditions. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING 8 ENGINEERING 28 Traffic Impact Study in City of Santa Ana <br />75B-160
The URL can be used to link to this page
Your browser does not support the video tag.