Laserfiche WebLink
Opening Year (2013) With Project Conditions <br />Queuing Analysis <br />The proposed project will have two access points along Main Street and two access points along <br />MacArthur Boulevard. The signalized intersection of MacArthur Place at MacArthur Boulevard is the <br />major access point, followed by the signalized intersection of Main Street at Sandpoint Avenue. A right- <br />in and right-out driveway located along MacArthur Boulevard, between Main Street and MacArthur <br />Place, will be another access point for the proposed project. The fourth access point will be a right-in <br />and right-out driveway along Main Street, between Sandpointe Avenue and MacArthur Boulevard. <br />A queuing analysis was conducted for the northbound right-turn movement at the proposed project <br />driveway along Main Street for the 2013 With Project conditions. Synchro software was used to <br />conduct the analysis. The trip distribution was adjusted for this analysis. Since the proposed project will <br />have three other access points, with majority of the project trips using the signalized intersection of <br />MacArthur Place at MacArthur Boulevard, it is assumed that 10% of the project trips will make a <br />northbound right-turn from Main Street onto the project driveway and 10% of project trips will make a <br />right-turn movement from the project driveway onto Main Street. No gate control is proposed at the <br />project driveway. <br />For the AM Peak Hour, there are 9 vehicles (approximately I vehicle every 6 minutes 40 seconds) <br />making a northbound right-turn movement onto the project driveway. For the PM Peak Hour, there <br />are 20 vehicles (approximately I vehicle every 3 minutes) making a right-turn movement at the project <br />driveway in the PM Peak Hour. Based on the low project turning volumes at the project driveway and <br />the Synchro queuing analysis, there will be no queue for the northbound right-turn movement, for both <br />the AM and PM Peak Hour. Therefore, no queuing impact of this project is predicted along Main Street. <br />See Appendix I for traffic volumes at the project driveway and queuing analysis worksheets. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING & ENGiNEERiNG 30 Traffic Impact Study in City of Santa Ana <br />75B-162