My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/04/2011
>
75B - PH - AMEND DEVELOPMENT AGMT 2005-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:48:50 PM
Creation date
3/31/2011 1:32:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
4/4/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Conclusions <br />CAA Planning, Inc. has requested a traffic impact study for the proposed Updated Main and MacArthur <br />Development Project. An Addendum to Final Environmental Impact Report No. 200402, MacArthur Place <br />South, was conducted in March 2009 by CAA Planning. At the time the study was conducted the site <br />was to include 775 condominium units (including a 276-unit condominium building) and a business hotel. <br />The developer has recently updated the site plan and proposed to increase the residential density of the <br />condominium project (5 story condominium building) from 276 to 300 condominium units. <br />Per the initial scoping process with the City of Santa Ana, eight critical intersections have been analyzed <br />for the Opening Year (2013) conditions and Long Range (2035) conditions. In all scenarios analyzed, <br />the study found that the proposed project would have no significant impact at any study intersection. <br />KOA Corporation recommends that the City of Santa Ana find the Updated Main and MacArthur <br />Development Project will not generate additional significant impact to the study intersections and <br />therefore will not generate adverse effect on the surrounding street system. <br />KOA CORPORATION Updated Main and MacArthur Development Project <br />PLANNING & ENGINEERING 36 Traffic Impact Study in City of Santa Ana <br />75B-168
The URL can be used to link to this page
Your browser does not support the video tag.