Laserfiche WebLink
2. Background <br />The MacArthur Place South FEIR, certified in 2005, identified the project area as an existing office park <br />formerly known as Hutton Centre. Since 1982, approximately 1,551,096 square feet of office, restaurant, <br />theater, retail, and hotel land uses were developed in Hutton Centre. Existing structures ranged from single- <br />story buildings to office towers ranging in height from 8 to 14 stories. The MacArthur Place South FEIR <br />included analysis of the following project components: <br />• Three 25-story residential towers, with a total of 501 residential units <br />• One low-rise loft building with 14 residential units and 10,000 square feet of office space <br />• A condominium complex including three low-rise buildings, with a total of 276 residential <br />units <br />• A restaurant and retail building totaling 13,871 square feet <br />Based on the analysis provided in the 2005 EIR, the City of Santa Ana approved a project configuration that <br />included the above components. Two of the residential high-rise towers, known as Skyline at MacArthur <br />Place, have been constructed with a total of 349 units. The MacArthur Place South project site plan approved <br />in 2005 is included herein for comparison purpose as Exhibit 3 - 2005 Site Plan. <br />In 2009, an Addendum to the MacArthur Place South FEIR (2009 Addendum) was approved by the City. <br />The Addendum proposed removal of the Cinema Lofts (14 units and 10,000 square feet of office use) and the <br />retail (5,291 square feet)/restaurant (8,580 square feet) components, to be replaced by a 185-room hotel with <br />surface parking. The Cinema Tower, with 154 residential units, was proposed to be relocated approximately <br />174 feet south from the original location analyzed in the FEIR. <br />The hotel proposed in the 2009 Addendum was 4 stories in height, 185 rooms, with a pool and spa and <br />support facilities. The City's final approval was for a 155-room hotel. A total of 615 parking spaces were <br />identified in the 2009 Addendum, which included a combination of spaces in the existing parking structure <br />and a surface parking lot and would be used on an interim basis. Future construction of the Cinema Tower <br />will include a new parking structure that will then meet the needs of the hotel guests and the Cinema Tower <br />residents. A Site Plan showing the hotel component is included herein as Exhibit 4- 2009 Site Plan. <br />3. Description of Proposed Project <br />The project applicant is proposing a modification to the low-rise condominium component of the project. <br />The condominiums, as approved in the FEIR, would include three buildings ranging in height from 50 to 60 <br />feet (5 and 6 stories) containing 276 residential units. The unit types ranged from one to three bedrooms and <br />baths. Residential styles included typical single-story condominiums, townhouses, and live/work units. An <br />interior courtyard would contain a water feature and a recreation area including a tot lot, a swimming pool, a <br />game table, a BBQ area, and a seating area. A total of 689 parking stalls would be provided on two levels of <br />parking - one subterranean level and one above-ground level. The architectural design featured a staggered <br />roofline, providing visual relief from that of a solid structure with a single roofline. <br />MacArthur Place South EIR - 2011 Addendum <br />75B-53