Laserfiche WebLink
City of Santa Ana <br />Request for Qualifications - Demolition Services <br />E. Cost and Price Proposal <br />CTO requests will be <br />received and reviewed by <br />Jim Cain, President of J&G. <br />Mr. Cain will negotiate the <br />work effort required to <br />complete the proposed <br />CTO with the CSA. <br />A cost total cost for the <br />CTO will be obtained using <br />the time and materials <br />rates presented both here <br />and on the Price Summary <br />Sheet, see Appendix C. <br />The hourly rates reflect all <br />costs and anticipated fees <br />for the contract duration, up <br />to a maximum of three <br />years. <br />All subcontractors will be at <br />cost plus 5% mark-up. <br />All materials, supplies, <br />disposal fees are at cost <br />plus 10% <br />Support vehicles are <br />included in hourly rate for <br />personnel category. <br />Protect Manager/Principal Agent _ <br />Project Manager/Field Superintendent <br />Field Superintendent <br />?Qffice manager <br />O erator <br />Laborer <br />Engineering/Environmental <br />973 Track Loader (bare rate) <br />980 Rubber Tires Loader bare rate <br />PC 400 Excavator - bucket bare rate <br />Attachments: <br />-- -Grapple----------__------- .. --- <br />Pad-die Wheel __?---- __ - <br />Pulverizer _ <br />j 3r0 Member Shear <br />2"a Member <br />Off Road 25-Ton+ Rock Trucks (be <br />Bobcat Sid Steer Loader - bucket( <br />$ 120.00 - -? <br />$_ - 95.00_.. i <br />-$- - 80.00 .- - --1 <br />$-_ _120.0.0 _ <br />$ s0 <br />0o- <br />- <br />- - <br />_ _ <br />: <br />100.00 <br />100.00 <br />-__ 130.00_ <br />----$30.00 <br />30.00 <br />95.00 _ <br />110.00 <br />120.00 _ <br />150.00 <br />115.00 <br />70.00 <br />i - Breaker_ -- --- - - - --_ _ -- i $. 45.00 <br />Shear $ -75.00 <br />_Power Sweeper_ _ $ 50.00 <br />Backhoe $ 50.00 _ <br />' Forklift _ $ __300/day _- <br />1500-2000 Gallon Water Truck $_ 300/d y <br />110,000 Gallon Elevated Water Tower $ 31.500/mo <br />Lo Bed Charges $ _ 150.00---- <br />Hi-side End Dump_ <br />Lo-side End Dump <br />110.00 <br />100.00 <br />J&G Industries Page 27 <br />25C-30