My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unless otherwise noted, the deliverables for the following technical studies will be a separate bound report including a <br />standardized project description, a methodology relevant to each topic area, description of the affected environment, <br />impact assessment, and mitigation measures. The screencheck technical study will be submitted to the City (two <br />copies) and to Caltrans (four copies) for concurrent review. Following City and Caltrans review a Draft of each <br />technical study will be submitted to the City (two copies) and to Caltrans (four copies) for concurrent review. <br />Following Caltrans and City second review it is assumed that a revisions workshop will be held to address any <br />outstanding comments, if any comments remain. Following the revisions workshop a final version of each report will <br />be prepared. The final technical studies (two copies to the City and four copies to Caltrans) will be submitted <br />following the workshop for final concurrence (no additional comments are assumed to be received associated with the <br />final concurrence review). <br />For this scope of work, the technical studies for which a specific scope of work has been included have been assumed <br />based on a review of existing project information. If additional studies are identified during the environmental phase of <br />the project a scope of work and cost will be submitted for approval prior to their initiation. <br />Deliverables: Screencheck technical studies (6 copies each) <br />Draft technical studies (6 copies each) <br />Final technical studies for concurrence (6 copies each) <br />Final approved technical studies (6 copies each) <br />The following assumptions have been made with regard to the technical studies that are to be prepared: <br />• Engineering plans, including limits of construction, staging areas, and borrow/disposal sites, if needed, will be <br />provided by the engineering team at a level of detail sufficient for preparing the technical studies (roadway lanes, <br />topographic information [including changes in topography resulting from the proposed project], state plane tick <br />marks, station numbers, and existing structures within 500 feet of the proposed project). <br />• Mapping showing existing conditions (roadway lanes, topographic information, state plane tick marks, station <br />numbers, and existing structures within 500 feet of the proposed project) will be provided by the engineering team. <br />• Cross sections along the alignment showing existing and proposed conditions at an interval sufficient for preparing <br />the noise analyses will be provided by the engineering team. <br />• Aerial photograph at a scale suitable for preparation of project mapping, figures, and analyses will be provided by <br />the engineering team (1 inch=200 feet scale minimum, with a minimum of 500 feet to the east and west of Pine <br />Avenue shown and any other areas of improvement). Pixel size shall be no more than 2.5 square feet and image <br />shall be orthorectified. <br />• Focused protocol surveys for any species are not included in this scope and cost, other those specified under the <br />Natural Environment Study scope. If additional focused surveys are identified during the biological field <br />reconnaissance then this will be communicated to AECOM and the City and a scope and cost for this work will be <br />provided. <br />• Geotechnical, traffic assessments, Storm Water Data Report (SWDR) and/or Water Quality Report, and any <br />floodplain analyses/technical reports (Location Hydraulic Study and Summary Floodplain Encroachment Report or <br />Floodplain Evaluation Report), if required, will be provided by AECOM and these analyses will be provided to <br />ICF Jones & Stokes for incorporation into the environmental document and for use in the technical analyses. <br />• Traffic information shall contain 24-hour and hourly traffic counts separated by direction and vehicle classification <br />(autos, medium trucks, heavy trucks) over at least three weekdays, along with peak hour and average daily traffic <br />(ADT) forecast traffic volumes for existing conditions, opening year, and design year with and without the project <br />for roads in the project area, and posted speeds. In addition, subregional/regional traffic information will be <br />provided that includes vehicle miles travelled (VMT) data for existing year, opening year (build and no -build) and <br />horizon year (build and no -build) broken down into five mph speed bins. This data is needed in order to evaluate <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.