Laserfiche WebLink
>P A-2011-024 <br />ULEu,v <br />DATE. [_ 1`1 AGREEMENT FOR PROVISION OF <br />'' PROFESSIONAL ENGINEERING SERVICES <br />947 <br />THIS AGREEMENT, made and entered into this 18th day of January, 2011 by and between <br />v AECOM a California corporation "Consultant" <br />rp on (hereinafter ), and the City of Santa Ana, a charter city <br />and municipal corporation organized and existing under the Constitution and laws of the State of <br />California (hereinafter "City"). <br />RECITALS <br />D � <br />(� A. The City desires to retain a consultant having special skill and knowledge in the field of <br />`>U engineering to prepare a Project Study Report Equivalent and Conceptual Engineering Plans for <br />the Santa Ana Boulevard Grade Separation Project. <br />'V <br />B. Consultant represents that Consultant is able and willing to provide such services to the City. <br />C. The project will be funded in part through funds administered by the Federal Highway <br />Administration and Caltrans retains oversight over the project. <br />D. In undertaking the performance of this Agreement, Consultant represents that it is <br />knowledgeable in its field and that any services performed by Consultant under this Agreement <br />will be performed in compliance with such standards as may reasonably be expected from a <br />professional consulting firm in the field. <br />NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms <br />and conditions hereinafter set forth, the parties agree as follows: <br />1. SCOPE OF SERVICES <br />Consultant shall provide professional and technical engineering services necessary to investigate <br />alignment alternatives, prepare a Project Study Report Equivalent (PSRE) for the Santa Ana Grade <br />Separation Project, as set forth in City's Request for Proposal, attached hereto as Exhibit A, as further <br />detailed in Consultant's Proposal dated April 6, 2010, attached hereto as Exhibit A-1 and revised Scope of <br />Services and Fee Schedule submitted on December 20, 2010, attached hereto as Exhibit A-2. Exhibit A, <br />A-1 and A-2 are incorporated by reference. <br />a. Scope of Work. The PSRE shall include preliminary environmental studies either PEAR <br />or PES as determined by the guidelines., cost estimates for construction and right-of-way, conceptual <br />engineering plans, evaluation of alternative alignment impacts, including right-of-way and traffic detour <br />routes during construction. The PSRE shall include 1) Project Management 2) research and data <br />collection; 3) aerial mapping and field survey; 4) utility survey 5) design and alignment alternatives <br />analysis and development of preferred alternative features and standards; 6) traffic analysis and traffic <br />management plan ; 7) structural analysis; 8) hydraulics and hydrology study; 9) site constraints analysis; <br />10) conceptual engineering plans; 11) right-of-way requirements; and 12) preliminary cost estimates 'and <br />project schedule ). Consultant shall also provide an environmental assessment including the preparation <br />of necessary studies and reports, holding the required public hearings, and submittal of documentation to <br />the necessary governing bodies. <br />